Photovoltaic power plant in Bosnia and Herzegovina

id - 328
icon
Bosnia and Herzegovina
Electric power industry
icon
14
  • Photovoltaic power plant in Bosnia and Herzegovina
  • Photovoltaic power plant in Bosnia and Herzegovina
    Photovoltaic power plant in Bosnia and Herzegovina
  • ()
    ()
    ()

    An investment opportunity to become partner for a newly built photovoltaic power plant in Bosnia and Herzegovina, with scalable output ranging from 18 MW AC to 36 MW AC. The plant is fully constructed with Tier 1 equipment and is backed by a new legal entity for a seamless ownership transition. The plant will be fully constructed in June 2026.

    General Info

    • Plant Footprint: 150,000 – 200,000 m²
    • Panel Orientation: South-facing
    • Developer/Contractor: Experienced local firm with regional expertise

    Technical Specifications

    • Installed DC Power: 22.5 MWp
    • Installed AC Power: 18 MW (scalable to 36 MW AC)
    • Annual Production (Expected): 20–25 GWh
    • PV Modules:
    • Risen Energy RSM132-8-695BHDG
    • PhonoSolar PS695M13GFH-22WSH
    • Output: 695 Wp, Efficiency: 22.4%
    • Inverters: SUNGROW SG350HX
    • European efficiency: 98.8%
    • IP66 protection class
    • Energy Management: SUNGROW EMU200A with industrial-grade networking and monitoring
    • Transformer Stations: 0.8/20 kV rated, outdoor, IEC 62271-202 compliant

    icon
    Kazakhstan
    Wind farm power station (5MW) in Kazakhstan Wind farm power station (5MW) in Kazakhstan
    ()
    585,000 $
    24,459,590 ₺
    ()
    346,000 $
    14,466,698 ₺
    ()
    4,000,000 $
    167,245,054 ₺