Photovoltaic power plant (12.5MW) in Bosnia and Herzegovina

id - 359
icon
Bosnia and Herzegovina
Electric power industry
icon
302
  • Photovoltaic power plant (12.5MW) in Bosnia and Herzegovina
  • Photovoltaic power plant (12.5MW) in Bosnia and Herzegovina
    Photovoltaic power plant (12.5MW) in Bosnia and Herzegovina
  • ()
    ()
    ()

    This is a 12.5 MW photovoltaic power plant project located in a high solar yield zone in Southeast Europe. Offered through a newly created company, the investment includes ownership of both the plant and the land it occupies. The development includes grid access rights via a 110 kV transformer station capable of transmitting up to 29.95 MW (AC). The medium voltage connection line is also included. The asset is structured for long-term returns and stability, with additional rental agreements in place covering transformer station usage for a 20-year period. The power plant will be fully constructed in June 2026.

    PV Modules

    • Models: RISEN ENERGY RSM132-8-695BHDG and PhonoSolar PS695M13GFH-22WSH
    • Power: 695 Wp each
    • Efficiency: 22.4%
    • Cell Type: n-type HJT

    Inverters

    • Brand: Sungrow SG350HX
    • AC Output: Up to 352 kVA
    • Efficiency: 99.02%

    Energy Management

    • Unit: Sungrow EMU200A
    • Supports 300+ devices, IP65 protection

    Transformer Stations

    • Type: DELING doo Tuzla, KTS-31
    • Rated Power: Up to 3,150 kVA
    • Fully compliant with IEC 62271-202 standards

    SPV Sale: Full sale of the newly formed company owning the PV plant and land

    Key Highlights:

    • Constructed PV plant
    • Legal ownership of land (15–20 hectares)
    • Medium voltage connection infrastructure
    • 110 kV transformer station access (for 29.95 MW AC)
    • Production of around 1100 MWh / 1 MW yearly
    • Current PPA price is 80 EUR per MWp
    • Rental Terms: The grid connection infrastructure (items 3 and 4) will be leased for 20 years.

    14,442,500 €
    116,998,970 ¥
    icon

    You can view prices for objects in the catalog and its basic business indicators in two currencies. The first one is the original currency set by the seller. The second one you can choose yourself. It's calculated by the rate of the Central Bank of the Russian Federation.

    icon
    DR Congo
    Solar Power Project (600 MW) in the DR Congo Solar Power Project (600 MW) in the DR Congo
    ()
    98,800,000 $
    676,711,458 ¥
    ()
    ()
    60
    450,000,000 $
    3,082,187,812 ¥
    icon
    Brazil
    Hydroelectric power station in Brazil Hydroelectric power station in Brazil
    ()
    ()
    ()
    5,000,000 $
    33,985,463 ¥
    icon
    Kyrgyzstan
    Hydro power plant (5,4MW) in Kyrgyzstan Hydro power plant (5,4MW) in Kyrgyzstan
    ()
    ()
    ()
    80
    8,990,000 $
    61,105,863 ¥