Hydroelectric power station in Brazil

Add to Favorites list
Add to Compare list
id - 327
icon
Brazil
Electric power industry
icon
1611
  • Hydroelectric power station in Brazil
  • Hydroelectric power station in Brazil
    Hydroelectric power station in Brazil
  • Revenue (year) No data
    Profit (year) No data
    Payback (mon.)
    Description

    This is the sale of a building permission and a project for the construction of a hydro power plant in Brazil. This hydro power plant has an installed power of 10 MW, it is located on the Lava ludo river, in the municipalities of Sao Joaquim and Urupema, in the state of Santa Catherine.

    Keypoints

    • Installed power — 10 MW
    • Physical guarantee (firm power) — 5.2 MW (average)
    • The engine consists of 3 Francis Simple Turbines, with a gross head of 54.7 m.

    Phases

    • The project meets its basic design with approved DRS, Environmental Study filed to obtain the Prior Environmental License.
    • The connection to the system will be through a 34.5kV transmission line with a length of 15 km connecting the 138 kV bus of the SE Coletora of the Lava ludo developments, to be built in consortium with several other plants.
    • Details General Arrangement, Schedule and Budget
    • The reservoir has an area of 63 ha of total area.
    • The dam will be rockfill with clay core, 211 m long and 22 m high.
    • The proposed spillway is of the lateral channel type, 100 m long, with design capacity of 1450 m3/s.
    • Adduction is carried out through a tunnel with a length of 2,487 m. The implementation timeline is 18 months.

    Budget

    The total cost of implementing this project is pre-estimated at R$72 million ($15,000,000 USD)

    The information in the catalog is not an exact offer. The parameters of the deal are specified during negotiations with the seller.

    To perform this action, you must log in or register on the site.
    Start negotiation
    Price
    5,000,000 $
    395,750,000 ₽
    To perform this action, you must log in or register on the site.
    Start negotiation
    icon Useful tip

    You can view prices for objects in the catalog and its basic business indicators in two currencies. The first one is the original currency set by the seller. The second one you can choose yourself. It's calculated by the rate of the Central Bank of the Russian Federation.

    Similar adverts
    icon
    Turkiye
    Photovoltaic solar power plants (48,2 MWp) in Turkiye Photovoltaic solar power plants (48,2 MWp) in Turkiye
    Revenue (year)
    10,000,000 $
    791,500,000 ₽
    Profit (year)
    No data
    Payback (mon.)
    Price
    55,500,000 $
    4,392,825,000 ₽
    icon
    Bosnia and Herzegovina
    Photovoltaic power plant in Bosnia and Herzegovina Photovoltaic power plant in Bosnia and Herzegovina
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    20,674,000 €
    1,898,681,554 ₽
    icon
    Turkiye
    Geothermal Power Station Project in Turkiye Geothermal Power Station Project in Turkiye
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    150,000,000 $
    11,872,500,000 ₽
    Currency rates calculator
    Contact REAB
    Contact REAB
    Messengers for this number