Solar Photovoltaic Plant Project (300 MW) in Argentina

id - 511
icon
Argentina
Electric power industry
icon
22
  • Solar Photovoltaic Plant Project (300 MW) in Argentina
  • Solar Photovoltaic Plant Project (300 MW) in Argentina
    Solar Photovoltaic Plant Project (300 MW) in Argentina
  • ()
    ()
    ()

    Opportunity to acquire a 300 MW pipeline consisting of one RTB (Ready-to-Build) asset with an active PPA and two advanced-stage projects targeting high-value mining and urban demand.

    Overview

    • Core Competencies: Full-cycle EPC, construction supervision, O&M, and permitting.
    • Institutional Strength: Deep-rooted relationships with legislative authorities and provincial governments in Catamarca, Salta, and Neuquén.
    • Value Add: Capability to navigate complex regulatory environments and secure PPAs in high-demand sectors (Mining/Industrial).
    Feature Project 1: Vaca Muerta (Neuquén) Project 2 & 3: Catamarca
    Capacity 100 MW (Scalable from 30 MW phase) 200 MW Total (2 x 100 MW)
    Status RTB / Partially Operating (3 MW active) Advanced Stage / Government Evaluation
    Offtaker Pampa Energía & Local Municipality Mining Industry & Urban Demand
    PPA Price USD 68/MW (Potential to renegotiate) USD 92/MW (Estimated)
    Timeline 18 months to full completion Provincial approval expected near-term
    Strategic Edge Immediate entry; existing PPA reduces risk High-margin mining demand; strong backing.

    The current renewable energy market is characterized by a scarcity of sellers. Most major players are holding assets for long-term cash flow.

    • The Opportunity: To avoid the “buyer’s premium” on fully operational assets, Interenergy should pivot toward RTB and under-construction projects. This allows for capturing early-stage value and securing positioning in high-growth corridors like the Vaca Muerta energy hub and the Northern mining belt.
    • Comparative Analysis: These assets should be benchmarked against the Jinko Cordillera — Cordillera 1 Project to determine the optimal financial and technical fit.

    icon
    Kazakhstan
    Operational Wind Power Plant (5 MW) in Kazakhstan Operational Wind Power Plant (5 MW) in Kazakhstan
    ()
    537,000 €
    4,252,396 ¥
    ()
    318,000 €
    2,518,179 ¥
    ()
    4,900,000 €
    38,802,123 ¥
    icon
    Kazakhstan
    Wind farm power station (5MW) in Kazakhstan Wind farm power station (5MW) in Kazakhstan
    ()
    585,000 $
    3,989,304 ¥
    ()
    346,000 $
    2,359,486 ¥
    ()
    4,000,000 $
    27,277,288 ¥
    icon
    Slovakia
    Biogas Power Plant (1 MW) with Farm in Slovakia Biogas Power Plant (1 MW) with Farm in Slovakia
    ()
    5,000,000 $
    34,070,473 ¥
    ()
    2,000,000 $
    13,628,190 ¥
    ()
    20,000,000 $
    136,281,892 ¥
    Contact REAB