Solar Photovoltaic Plant Project (300 MW) in Argentina

id - 511
icon
Argentina
Electric power industry
icon
18
  • Solar Photovoltaic Plant Project (300 MW) in Argentina
  • Solar Photovoltaic Plant Project (300 MW) in Argentina
    Solar Photovoltaic Plant Project (300 MW) in Argentina
  • ()
    ()
    ()

    Opportunity to acquire a 300 MW pipeline consisting of one RTB (Ready-to-Build) asset with an active PPA and two advanced-stage projects targeting high-value mining and urban demand.

    Overview

    • Core Competencies: Full-cycle EPC, construction supervision, O&M, and permitting.
    • Institutional Strength: Deep-rooted relationships with legislative authorities and provincial governments in Catamarca, Salta, and Neuquén.
    • Value Add: Capability to navigate complex regulatory environments and secure PPAs in high-demand sectors (Mining/Industrial).
    Feature Project 1: Vaca Muerta (Neuquén) Project 2 & 3: Catamarca
    Capacity 100 MW (Scalable from 30 MW phase) 200 MW Total (2 x 100 MW)
    Status RTB / Partially Operating (3 MW active) Advanced Stage / Government Evaluation
    Offtaker Pampa Energía & Local Municipality Mining Industry & Urban Demand
    PPA Price USD 68/MW (Potential to renegotiate) USD 92/MW (Estimated)
    Timeline 18 months to full completion Provincial approval expected near-term
    Strategic Edge Immediate entry; existing PPA reduces risk High-margin mining demand; strong backing.

    The current renewable energy market is characterized by a scarcity of sellers. Most major players are holding assets for long-term cash flow.

    • The Opportunity: To avoid the “buyer’s premium” on fully operational assets, Interenergy should pivot toward RTB and under-construction projects. This allows for capturing early-stage value and securing positioning in high-growth corridors like the Vaca Muerta energy hub and the Northern mining belt.
    • Comparative Analysis: These assets should be benchmarked against the Jinko Cordillera — Cordillera 1 Project to determine the optimal financial and technical fit.

    icon
    Kyrgyzstan
    Hydro power plant (5,4MW) in Kyrgyzstan Hydro power plant (5,4MW) in Kyrgyzstan
    ()
    ()
    ()
    80
    8,990,000 $
    61,305,704 ¥
    icon
    Turkiye
    Geothermal Power Station Project in Turkiye Geothermal Power Station Project in Turkiye
    ()
    ()
    ()
    150,000,000 $
    1,022,898,274 ¥
    icon
    Brazil
    Project of 14.7MW Hydro power plant in Brazil Project of 14.7MW Hydro power plant in Brazil
    ()
    ()
    ()
    3,500,000 $
    23,867,627 ¥
    Contact REAB