Electric company with two hydroelectric power plants in Serbia

Add to Favorites list
Add to Compare list
id - 246
icon
Serbia
Electric power industry
icon
850
  • Electric company with two hydroelectric power plants in Serbia
  • Electric company with two hydroelectric power plants in Serbia
    Electric company with two hydroelectric power plants in Serbia
  • Revenue (year) 720,940 €
    35,205,604 ₺
    Profit (year) No data
    Payback (mon.)
    Description

    An electric company with two hydroelectric power plants is for sale. The company has constructed and operated two hydro power plants in Serbia with installed capacity equal to 989kW + 630kW.

    HHP 1

    The HPP 1 is the run-of-river hydropower plant and is consisted of two water intakes, inlet pipeline and turbine hall with two turbines. The total installed flow rate of HPP, minus the biological minimum, is: Qins = 1600 l/s. All pipeline routes run along water courses mainly in the water land area. In the cases of inaccessible parts of the terrain in locations where the coast is steep, these routes were moved to the other side, where the terrain conditions are more favorable or an AB niche was built so that the pipeline can be placed there.

    Tyrolean type water intakes have been chosen as adequate solution and those that can fulfill the purpose and adopted capacities.

    This SHPP is a run-of-river type of hydropower plant in which two Francis turbine units have been installed and which is regulated by the level of the upper water.

    HHP 2

    The HHP 2 is the run-of-river hydropower plant and is consisted of three water intakes, inlet pipeline and turbine hall with two turbines.

    The total installed flow, minus the biological minimum, is: Qins = 916 l / s

    All pipeline routes run along water courses mainly in the water land area. In the cases of inaccessible parts of the terrain in locations where the coast is steep, these routes were moved to the other side, where the terrain conditions are more favorable or an AB niche was built so that the pipeline can be placed there. Where the pipelines are crossing below the rivers, the pipeline is covered with minimum 25 cm concrete cladding.

    Tyrolean type water intakes have been chosen as adequate solution and those that can fulfill the purpose and adopted capacities.

    Annual revenues per year:

    • 2020 — 417,099 €
    • 2021 — 587,717 €
    • 2022 — 473,319 €
    • 2023 — 720,939 €

    The information in the catalog is not an exact offer. The parameters of the deal are specified during negotiations with the seller.

    To perform this action, you must log in or register on the site.
    Start negotiation
    Similar adverts
    icon
    Bosnia and Herzegovina
    Photovoltaic power plant in Bosnia and Herzegovina Photovoltaic power plant in Bosnia and Herzegovina
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    20,674,000 €
    1,009,571,724 ₺
    icon
    Turkiye
    Geothermal Power Station Project in Turkiye Geothermal Power Station Project in Turkiye
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    150,000,000 $
    6,271,689,522 ₺
    icon
    Brazil
    Project of 14.7MW Hydro power plant in Brazil Project of 14.7MW Hydro power plant in Brazil
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    3,500,000 $
    146,339,423 ₺
    Previously viewed
    icon
    Turkiye
    Chrome ore production business in Turkiye Chrome ore production business in Turkiye
    Price
    17,500,000 $
    731,697,111 ₺
    Currency rates calculator
    Contact REAB
    Contact REAB
    Messengers for this number