Geothermal Power Station Project in Turkiye

id - 337
icon
Turkiye
Electric power industry
Views: 24
  • Geothermal Power Station Project in Turkiye
  • Geothermal Power Station Project in Turkiye
    Geothermal Power Station Project in Turkiye
  • Revenue (year) No data
    Profit (year) No data
    Payback (mon.)
    Description

    Geothermal Exploration Business operation license located in Salihli district, approximately 55 km southeast of Manisa province, and covers an area of 4939.32 hectares.

    Many geophysical studies have been carried out by different researchers in different years in the field. With the synthesis of these data, 8 different locations with the highest probability of the presence of hot fluid within the license area were determined.

    There are 2 geothermal wells in the license area. The first of these is the Arma-1 (2,482 m) well drilled for research purposes. The second well drilled in the field and used for greenhouse heating is the D-1 (849 m) well.

    There are many geothermal operation license fields adjacent to and in the vicinity of the operation license number 2015/04. There are more than 50 geothermal wells with temperatures ranging from 65 to 287 °C in these license areas. These wells are used in different fields such as electricity generation, greenhouse cultivation and residential heating.

    With the Monte Carlo Simulation prepared for the license area, the possible thermal heat reserve of the area and the amount of power that can be produced were calculated.

    Accordingly, the reproducible thermal heat reserve is calculated as 2.3×1015 kJ with 85% probability, 18.6 MWe with 95% probability, 25.5 MWe with 85% probability, and 57.0 MWe with 50% probability.

    The reproducible thermal heat reserve was calculated by operating 10,000 times. With the Monte Carlo Simulation for the study area, it has been determined that the thermal heat value that can be produced in the reservoir will be between 9.7×1015 kJ and 1.6×1015 kJ in the 5%-95% confidence interval. Here, the most probable value was determined as 4.9×1015 kJ.

    The electricity generation potential of the geothermal license area is planned according to the Monte Carlo simulation result for 22 years of production; the electricity generation potential was calculated to be between 112.2 MWe and 18.6 MWe in the 5%-95% confidence interval. It was concluded that this value was 57.05 MWe on average.

    Key Data

    • YEKDEM price: 205.13 TL / kWh
    • Application period: 15 years
    • Domestic contribution price: 29.25 TL / kWh
    • Domestic contribution validity period: 5 years.

    The information in the catalog is not an exact offer. The parameters of the deal are specified during negotiations with the seller.

    To perform this action, you must log in or register on the site.
    Start negotiation
    Similar adverts
    icon
    Turkiye
    Photovoltaic solar power plants (48,2 MWp) in Turkiye Photovoltaic solar power plants (48,2 MWp) in Turkiye
    Revenue (year)
    10,000,000 $
    843,798,000 ₽
    Profit (year)
    No data
    Payback (mon.)
    Price
    55,500,000 $
    4,683,078,900 ₽
    icon
    Brazil
    Hydroelectric power station in Brazil Hydroelectric power station in Brazil
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    5,000,000 $
    421,899,000 ₽
    icon
    Bosnia and Herzegovina
    Photovoltaic power plant in Bosnia and Herzegovina Photovoltaic power plant in Bosnia and Herzegovina
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    20,674,000 €
    2,053,556,690 ₽
    Currency rates calculator
    Contact REAB
    Contact REAB
    Messengers for this number