Photovoltaic power plant (12.5MW) in Bosnia and Herzegovina

Add to Favorites list
Add to Compare list
id - 359
icon
Bosnia and Herzegovina
Electric power industry
icon
466
  • Photovoltaic power plant (12.5MW) in Bosnia and Herzegovina
  • Photovoltaic power plant (12.5MW) in Bosnia and Herzegovina
    Photovoltaic power plant (12.5MW) in Bosnia and Herzegovina
  • Revenue (year) No data
    Profit (year) No data
    Payback (mon.)
    Description

    This is a 12.5 MW photovoltaic power plant project located in a high solar yield zone in Southeast Europe. Offered through a newly created company, the investment includes ownership of both the plant and the land it occupies. The development includes grid access rights via a 110 kV transformer station capable of transmitting up to 29.95 MW (AC). The medium voltage connection line is also included. The asset is structured for long-term returns and stability, with additional rental agreements in place covering transformer station usage for a 20-year period. The power plant will be fully constructed in June 2026.

    PV Modules

    • Models: RISEN ENERGY RSM132-8-695BHDG and PhonoSolar PS695M13GFH-22WSH
    • Power: 695 Wp each
    • Efficiency: 22.4%
    • Cell Type: n-type HJT

    Inverters

    • Brand: Sungrow SG350HX
    • AC Output: Up to 352 kVA
    • Efficiency: 99.02%

    Energy Management

    • Unit: Sungrow EMU200A
    • Supports 300+ devices, IP65 protection

    Transformer Stations

    • Type: DELING doo Tuzla, KTS-31
    • Rated Power: Up to 3,150 kVA
    • Fully compliant with IEC 62271-202 standards

    SPV Sale: Full sale of the newly formed company owning the PV plant and land

    Key Highlights:

    • Constructed PV plant
    • Legal ownership of land (15–20 hectares)
    • Medium voltage connection infrastructure
    • 110 kV transformer station access (for 29.95 MW AC)
    • Production of around 1100 MWh / 1 MW yearly
    • Current PPA price is 80 EUR per MWp
    • Rental Terms: The grid connection infrastructure (items 3 and 4) will be leased for 20 years.

    The information in the catalog is not an exact offer. The parameters of the deal are specified during negotiations with the seller.

    To perform this action, you must log in or register on the site.
    Start negotiation
    Similar adverts
    icon
    Turkiye
    Geothermal Power Station Project in Turkiye Geothermal Power Station Project in Turkiye
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    150,000,000 $
    12,290,235,000 ₽
    icon
    Brazil
    Project of 14.7MW Hydro power plant in Brazil Project of 14.7MW Hydro power plant in Brazil
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    3,500,000 $
    286,772,150 ₽
    icon
    Kazakhstan
    Project of 4 Hydro power plants (33 MW) in Kazakhstan Project of 4 Hydro power plants (33 MW) in Kazakhstan
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    12,500,000 $
    1,024,186,250 ₽
    Previously viewed
    icon
    Russia
    Gold deposit in the Magadan region, Russia Gold deposit in the Magadan region, Russia
    Price
    800,000,000 ₽
    icon
    Russia
    Cargo seaport in the south of Primorsky region, Russia Cargo seaport in the south of Primorsky region, Russia
    Urgent! Fast deal
    Price
    77,000,000 $
    6,308,987,300 ₽
    Currency rates calculator
    Contact REAB
    Contact REAB
    Messengers for this number