Industrial photovoltaic park project (400 MW) in Romania

Add to Favorites list
Add to Compare list
id - 426
icon
Romania
Electric power industry
icon
47
  • Industrial photovoltaic park project (400 MW) in Romania
  • Industrial photovoltaic park project (400 MW) in Romania
    Industrial photovoltaic park project (400 MW) in Romania
  • Revenue (year) No data
    Profit (year) No data
    Payback (mon.) 60
    Description

    This opportunity presents a shovel-ready, utility-scale photovoltaic (PV) park project located in the highly strategic Western region of Romania, a dominant market for renewable energy in Central and Eastern Europe (CEE).

    Key Development & Permitting Milestones

    The project significantly de-risked and is positioned for immediate construction:

    • Land Security: 100% of the necessary land (442 hectares) has been secured through lease and concession contracts for a long-term duration of 30 – 49 years.
    • Permits Obtained: Both the Urbanism Certificates and the critical Grid Connection Permit (ATR) have been secured from Transelectrica (the National Transmission System Operator).
    • High-Voltage Grid Access: The connection point is confirmed and established on the high-capacity 400 kV Arad–Mintia transmission line.

    Technical Specifications & Future Upside

    • Configuration: The park will utilize a total of 732,137 high-efficiency panels (rated at 585 W each) and 1,980 inverters.
    • Specific Yield: The location benefits from high solar irradiation, resulting in an expected specific yield of 1,600 MWh/year
    • Optional Hybrid Phase: The project design is future-proofed with the option to integrate a Battery Energy Storage System (BESS) of up to 100 MWh, adding significant operational flexibility and potential revenue streams.

    Financial Projections (Estimated)

    The project offers highly attractive financial returns indicative of a premium, large-scale asset in the EU market:

    • Total Annual Energy Production: 640,000 MWh/year (640 GWh)
    • Estimated Annual Revenue: 51–57 million EUR/year
    • Estimated CAPEX: 200 million EUR
    • Estimated Payback Period: 4–5 years

    This opportunity offers international investors a direct pathway to acquire a large-scale, de-risked, and bankable asset contributing to one of the fastest-growing renewable energy markets in Europe.

    The information in the catalog is not an exact offer. The parameters of the deal are specified during negotiations with the seller.

    To perform this action, you must log in or register on the site.
    Start negotiation
    Price
    28,000,000 €
    2,483,678,400 ₽
    To perform this action, you must log in or register on the site.
    Start negotiation
    icon Useful tip

    Want to know how much your business is really worth? Order our valuation service — simplified or extended.

    Similar adverts
    icon
    Romania
    Solar photovoltaic power plant (108 MW) in Romania Solar photovoltaic power plant (108 MW) in Romania
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    8,640,000 €
    789,528,384 ₽
    icon
    Turkiye
    Photovoltaic solar power plants (48,2 MWp) in Turkiye Photovoltaic solar power plants (48,2 MWp) in Turkiye
    Revenue (year)
    10,000,000 $
    778,998,000 ₽
    Profit (year)
    No data
    Payback (mon.)
    Price
    55,500,000 $
    4,323,438,900 ₽
    icon
    Bosnia and Herzegovina
    Photovoltaic power plant in Bosnia and Herzegovina Photovoltaic power plant in Bosnia and Herzegovina
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    20,674,000 €
    1,889,202,525 ₽
    Currency rates calculator
    Contact REAB
    Contact REAB
    Messengers for this number