Photovoltaic power plant in Bosnia and Herzegovina

Add to Favorites list
Add to Compare list
id - 328
icon
Bosnia and Herzegovina
Electric power industry
icon
1278
  • Photovoltaic power plant in Bosnia and Herzegovina
  • Photovoltaic power plant in Bosnia and Herzegovina
    Photovoltaic power plant in Bosnia and Herzegovina
  • Revenue (year) No data
    Profit (year) No data
    Payback (mon.)
    Description

    An investment opportunity to become partner for a newly built photovoltaic power plant in Bosnia and Herzegovina, with scalable output ranging from 18 MW AC to 36 MW AC. The plant is fully constructed with Tier 1 equipment and is backed by a new legal entity for a seamless ownership transition. The plant will be fully constructed in June 2026.

    General Info

    • Plant Footprint: 150,000 – 200,000 m²
    • Panel Orientation: South-facing
    • Developer/Contractor: Experienced local firm with regional expertise

    Technical Specifications

    • Installed DC Power: 22.5 MWp
    • Installed AC Power: 18 MW (scalable to 36 MW AC)
    • Annual Production (Expected): 20–25 GWh
    • PV Modules:
    • Risen Energy RSM132-8-695BHDG
    • PhonoSolar PS695M13GFH-22WSH
    • Output: 695 Wp, Efficiency: 22.4%
    • Inverters: SUNGROW SG350HX
    • European efficiency: 98.8%
    • IP66 protection class
    • Energy Management: SUNGROW EMU200A with industrial-grade networking and monitoring
    • Transformer Stations: 0.8/20 kV rated, outdoor, IEC 62271-202 compliant

    The information in the catalog is not an exact offer. The parameters of the deal are specified during negotiations with the seller.

    To perform this action, you must log in or register on the site.
    Start negotiation
    Price
    20,674,000 €
    1,903,947,222 ₽
    To perform this action, you must log in or register on the site.
    Start negotiation
    icon Useful tip

    You can view prices for objects in the catalog and its basic business indicators in two currencies. The first one is the original currency set by the seller. The second one you can choose yourself. It's calculated by the rate of the Central Bank of the Russian Federation.

    Similar adverts
    icon
    Romania
    Industrial photovoltaic park project (400 MW) in Romania Industrial photovoltaic park project (400 MW) in Romania
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    60
    Price
    28,000,000 €
    2,483,678,400 ₽
    icon
    Brazil
    Hydroelectric power station in Brazil Hydroelectric power station in Brazil
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    5,000,000 $
    391,133,500 ₽
    icon
    Kyrgyzstan
    Hydro power plant (5,4MW) in Kyrgyzstan Hydro power plant (5,4MW) in Kyrgyzstan
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    80
    Price
    8,990,000 $
    703,258,033 ₽
    Currency rates calculator
    Contact REAB
    Contact REAB
    Messengers for this number