Solar Photovoltaic Plant (185 MW) in Romania

Add to Favorites list
Add to Compare list
id - 463
icon
Romania
Electric power industry
icon
23
  • Solar Photovoltaic Plant (185 MW) in Romania
  • Solar Photovoltaic Plant (185 MW) in Romania
    Solar Photovoltaic Plant (185 MW) in Romania
  • Revenue (year) No data
    Profit (year) No data
    Payback (mon.)
    Description

    A project to build a 185 MW solar power plant and a 50 MW energy storage system in Romania is available for purchase by interested investors. The project includes all permits and an electricity sales agreement (PPA).

    Romania is one of the most important energy export countries of the future in Europe. Romania In western industrialized countries, green electricity and green hydrogen are considered the most important energy sources of the future. Romania is also defined by EU and USA as the number one energy export country to the Ukraine.

    For 2030, the new target set by the Romanian government is 30.7 %, achievable by adding 7GW in renewable capacity. In 2020, the production of electricity in Romania came in the proportion of 12.4 %wind energy, 3.4 % from photovoltaic solar panels and 27.6 % from hydropower. In total, renewable energy production (wind, photovoltaic and biomass) accounted for 16 % of the total.

    As the second largest power market in Central and Eastern Europe, Romania has the potential of attractive significant investments in the years to come in new generation capacities based on low carbon technologies.

    The country is currently setting up a new primary legislative framework meant to facilitate investments under merchant market conditions, as a result of a full liberalization and alignment with the European Union (EU) electricity market reform. Policy wise, Romania has ambitious decarbonization targets and is looking to implement reforms in the sector, to attract sustainable investments coming from the public sector and private power producers as well as institutional investors and various EU funds under the Green Deal agenda.

    In 2020, important steps have been taken to revive the renewable energy sector in Romania. In May 2020, the Ministry of Economy, Energy and the Business Environment announced the reintroduction of Long-term Bilateral Power Purchase Agreements (PPAs) after these having been banned for almost eight years. The amendments to the Energy Law 123/2012 allowed PPAs for power-generation capacities that will be commissioned after 1 June 2020. These amendments are part of the commitment Romania made to the European. Commission to deregulate its electricity market as of 1 January 2021 to stimulate investments in new electricity-generation capacities.

    Keypoints

    • Location: Călărași County, Romania
    • Total Land Area: 220 ha + 50 ha
    • Land Type: Energy-designated land
    • Distance to Grid Connection Point: 0.1 km (400 kV line on-site)
    • Total Power (DC): 259 MW
    • Total Power (AC): 185 MW
    • Project Type: Fixed installation
    • Average Horizontal Irradiation: 1,413 kWh/m²/year
    • Specific Production: 1,689 kWh/kWp/year
    • Landowner UAT (Municipality): Concession
    • Land Lease Agreement: Signed and publicly registered
    • Lease Term & Price: 39 years at €2,500/ha/year

    Permitting Status

    • Urban planning certificate – Obtained;
    • Topographical studies – Obtained;
    • Geological studies – Obtained;
    • Environmental approval – positive – first step – Obtained;
    • Concession contract for 39 years – Obtained;
    • The solution study – Obtained;
    • Technical approval for connection (ATR) – Obtained;
    • New technical approval for connection 02/2025 (ATR) with connection costs improved by 6M EUR – Obtained;
    • All the environmental approvals – Obtained;
    • Connection contract – Signed
    • Construction permit for the batteries Plant and the Transformer Station – Obtained

    The information in the catalog is not an exact offer. The parameters of the deal are specified during negotiations with the seller.

    To perform this action, you must log in or register on the site.
    Start negotiation
    Price
    13,875,000 €
    1,274,267,513 ₽
    To perform this action, you must log in or register on the site.
    Start negotiation
    icon Useful tip

    Want to receive regular updates from this website — new lots, articles, news? Subscribe to them in your preferred social network. The list of all social networks with our publications is at the bottom of any page of the website.

    Similar adverts
    icon
    Kazakhstan
    Project of 4 Hydro power plants (33 MW) in Kazakhstan Project of 4 Hydro power plants (33 MW) in Kazakhstan
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    12,500,000 $
    988,350,000 ₽
    icon
    Argentina
    Wind farm project (1,350 MW) in Argentina Wind farm project (1,350 MW) in Argentina
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    44,000,000 $
    3,478,992,000 ₽
    icon
    Kazakhstan
    Cascade of two hydroelectric power plants (6+6 MW) in the Almaty region, Kazakhstan Cascade of two hydroelectric power plants (6+6 MW) in the Almaty region, Kazakhstan
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    7,500,000 $
    570,702,750 ₽
    Currency rates calculator
    Contact REAB
    Contact REAB
    Messengers for this number