Geothermal Power Station Project in Turkiye

id - 337
icon
Turkiye
Electric power industry
icon
16
  • Geothermal Power Station Project in Turkiye
  • Geothermal Power Station Project in Turkiye
    Geothermal Power Station Project in Turkiye
  • ()
    ()
    ()

    Geothermal Exploration Business operation license located in Salihli district, approximately 55 km southeast of Manisa province, and covers an area of 4939.32 hectares.

    Many geophysical studies have been carried out by different researchers in different years in the field. With the synthesis of these data, 8 different locations with the highest probability of the presence of hot fluid within the license area were determined.

    There are 2 geothermal wells in the license area. The first of these is the Arma-1 (2,482 m) well drilled for research purposes. The second well drilled in the field and used for greenhouse heating is the D-1 (849 m) well.

    There are many geothermal operation license fields adjacent to and in the vicinity of the operation license number 2015/04. There are more than 50 geothermal wells with temperatures ranging from 65 to 287 °C in these license areas. These wells are used in different fields such as electricity generation, greenhouse cultivation and residential heating.

    With the Monte Carlo Simulation prepared for the license area, the possible thermal heat reserve of the area and the amount of power that can be produced were calculated.

    Accordingly, the reproducible thermal heat reserve is calculated as 2.3×1015 kJ with 85% probability, 18.6 MWe with 95% probability, 25.5 MWe with 85% probability, and 57.0 MWe with 50% probability.

    The reproducible thermal heat reserve was calculated by operating 10,000 times. With the Monte Carlo Simulation for the study area, it has been determined that the thermal heat value that can be produced in the reservoir will be between 9.7×1015 kJ and 1.6×1015 kJ in the 5%-95% confidence interval. Here, the most probable value was determined as 4.9×1015 kJ.

    The electricity generation potential of the geothermal license area is planned according to the Monte Carlo simulation result for 22 years of production; the electricity generation potential was calculated to be between 112.2 MWe and 18.6 MWe in the 5%-95% confidence interval. It was concluded that this value was 57.05 MWe on average.

    Key Data

    • YEKDEM price: 205.13 TL / kWh
    • Application period: 15 years
    • Domestic contribution price: 29.25 TL / kWh
    • Domestic contribution validity period: 5 years.

    150,000,000 $
    1,070,878,477 ¥
    icon

    Interested in an ad in the catalog? To avoid losing it and easily find it in the future, add it to "Favorites". To do this, click the heart icon in the upper right corner of the card or ad page.

    icon
    Argentina
    Photovoltaic Solar Plant (95 MWp) in Argentina Photovoltaic Solar Plant (95 MWp) in Argentina
    ()
    14,114,000 $
    100,762,526 ¥
    ()
    5,500,000 $
    39,265,545 ¥
    ()
    74,000,000 $
    528,300,049 ¥
    icon
    Argentina
    Wind farm project (1,350 MW) in Argentina Wind farm project (1,350 MW) in Argentina
    ()
    ()
    ()
    44,000,000 $
    314,124,354 ¥
    icon
    Bosnia and Herzegovina
    Photovoltaic power plant (12.5MW) in Bosnia and Herzegovina Photovoltaic power plant (12.5MW) in Bosnia and Herzegovina
    ()
    ()
    ()
    14,442,500 €
    120,423,344 ¥
    icon
    Uganda
    Pozzolana mine in Uganda Pozzolana mine in Uganda
    22,000,000 $
    157,062,177 ¥
    icon
    Kazakhstan
    Wind farm power station (5 MW) in Kazakhstan Wind farm power station (5 MW) in Kazakhstan
    4,000,000 $
    28,556,760 ¥
    icon
    Kazakhstan
    Copper deposit in Kazakhstan Copper deposit in Kazakhstan
    7,700,000 $
    54,971,762 ¥