Industrial photovoltaic park project (400 MW) in Romania

id - 426
icon
Romania
Electric power industry
icon
239
  • Industrial photovoltaic park project (400 MW) in Romania
  • Industrial photovoltaic park project (400 MW) in Romania
    Industrial photovoltaic park project (400 MW) in Romania
  • ()
    ()
    () 60

    This opportunity presents a shovel-ready, utility-scale photovoltaic (PV) park project located in the highly strategic Western region of Romania, a dominant market for renewable energy in Central and Eastern Europe (CEE).

    Key Development & Permitting Milestones

    The project significantly de-risked and is positioned for immediate construction:

    • Land Security: 100% of the necessary land (442 hectares) has been secured through lease and concession contracts for a long-term duration of 30 – 49 years.
    • Permits Obtained: Both the Urbanism Certificates and the critical Grid Connection Permit (ATR) have been secured from Transelectrica (the National Transmission System Operator).
    • High-Voltage Grid Access: The connection point is confirmed and established on the high-capacity 400 kV Arad–Mintia transmission line.

    Technical Specifications & Future Upside

    • Configuration: The park will utilize a total of 732,137 high-efficiency panels (rated at 585 W each) and 1,980 inverters.
    • Specific Yield: The location benefits from high solar irradiation, resulting in an expected specific yield of 1,600 MWh/year
    • Optional Hybrid Phase: The project design is future-proofed with the option to integrate a Battery Energy Storage System (BESS) of up to 100 MWh, adding significant operational flexibility and potential revenue streams.

    Financial Projections (Estimated)

    The project offers highly attractive financial returns indicative of a premium, large-scale asset in the EU market:

    • Total Annual Energy Production: 640,000 MWh/year (640 GWh)
    • Estimated Annual Revenue: 51–57 million EUR/year
    • Estimated CAPEX: 200 million EUR
    • Estimated Payback Period: 4–5 years

    This opportunity offers international investors a direct pathway to acquire a large-scale, de-risked, and bankable asset contributing to one of the fastest-growing renewable energy markets in Europe.

    28,000,000 €
    220,648,758 ¥
    icon

    You can view prices for objects in the catalog and its basic business indicators in two currencies. The first one is the original currency set by the seller. The second one you can choose yourself. It's calculated by the rate of the Central Bank of the Russian Federation.

    icon
    Slovakia
    Biogas Power Plant (1 MW) with Farm in Slovakia Biogas Power Plant (1 MW) with Farm in Slovakia
    ()
    5,000,000 $
    33,863,730 ¥
    ()
    2,000,000 $
    13,545,492 ¥
    ()
    20,000,000 $
    135,454,919 ¥
    Contact REAB