Industrial photovoltaic park project (400 MW) in Romania

id - 426
icon
Romania
Electric power industry
icon
416
  • Industrial photovoltaic park project (400 MW) in Romania
  • Industrial photovoltaic park project (400 MW) in Romania
    Industrial photovoltaic park project (400 MW) in Romania
  • ()
    ()
    () 60

    This opportunity presents a shovel-ready, utility-scale photovoltaic (PV) park project located in the highly strategic Western region of Romania, a dominant market for renewable energy in Central and Eastern Europe (CEE).

    Key Development & Permitting Milestones

    The project significantly de-risked and is positioned for immediate construction:

    • Land Security: 100% of the necessary land (442 hectares) has been secured through lease and concession contracts for a long-term duration of 30 – 49 years.
    • Permits Obtained: Both the Urbanism Certificates and the critical Grid Connection Permit (ATR) have been secured from Transelectrica (the National Transmission System Operator).
    • High-Voltage Grid Access: The connection point is confirmed and established on the high-capacity 400 kV Arad–Mintia transmission line.

    Technical Specifications & Future Upside

    • Configuration: The park will utilize a total of 732,137 high-efficiency panels (rated at 585 W each) and 1,980 inverters.
    • Specific Yield: The location benefits from high solar irradiation, resulting in an expected specific yield of 1,600 MWh/year
    • Optional Hybrid Phase: The project design is future-proofed with the option to integrate a Battery Energy Storage System (BESS) of up to 100 MWh, adding significant operational flexibility and potential revenue streams.

    Financial Projections (Estimated)

    The project offers highly attractive financial returns indicative of a premium, large-scale asset in the EU market:

    • Total Annual Energy Production: 640,000 MWh/year (640 GWh)
    • Estimated Annual Revenue: 51–57 million EUR/year
    • Estimated CAPEX: 200 million EUR
    • Estimated Payback Period: 4–5 years

    This opportunity offers international investors a direct pathway to acquire a large-scale, de-risked, and bankable asset contributing to one of the fastest-growing renewable energy markets in Europe.

    28,000,000 €
    2,548,901,600 ₽
    icon

    This website can automatically make regular searches in the catalog according to your conditions and send you the results. For subscribing, you need to register on the site.

    icon
    Slovakia
    Biogas Power Plant (1 MW) with Farm in Slovakia Biogas Power Plant (1 MW) with Farm in Slovakia
    ()
    5,000,000 $
    410,758,000 ₽
    ()
    2,000,000 $
    164,303,200 ₽
    ()
    20,000,000 $
    1,643,032,000 ₽
    icon
    DR Congo
    Solar Power Project (600 MW) in the DR Congo Solar Power Project (600 MW) in the DR Congo
    450,000,000 $
    36,968,220,000 ₽
    icon
    Brazil
    Wind farm (32.5 MW) in northeastern Brazil Wind farm (32.5 MW) in northeastern Brazil
    5,000,000 $
    410,758,000 ₽
    Contact REAB