Solar photovoltaic power plant (125 MW) in Brazil

id - 465
icon
Brazil
Electric power industry
icon
11
  • Solar photovoltaic power plant (125 MW) in Brazil
  • Solar photovoltaic power plant (125 MW) in Brazil
    Solar photovoltaic power plant (125 MW) in Brazil
  • ()
    ()
    ()

    The opportunity refers to a 125 MW (167 MWp) solar plant in Brazil awarded through a federal auction process. The project is currently ready-to-build, with development structured to move directly into the construction phase. The plant is scheduled to reach commercial operation in January 2027 and benefits from 15 years of government-backed contracted remuneration under the federal auction rules.

    Regulatory and Environmental Aspects

    • Land Access (signed 35 years lease agreement)
    • High Voltage Transmission Line Land Access Aug/2022
    • Preliminary Environmental License Dec/2020
    • Definitive Environmental License Sep/2022
    • Grid Access Permission Jan/2022
    • Authorization Grant Federal Government ANEEL Aug/2021
    • Transmission Line Access Agreement (CUSD) Apr/2022
    • Archaeological Authorization Mar/2023
    • Ready to Build Apr/2023

    Aspects of Power Generation and PPAs

    • Project XXXXXXXX I e II
    • COD January 2027
    • Power Capacity (DC) 167.6 MWp
    • Power Capacity (AC) 125.0 MWac
    • CapEx BRL 502.8 million
    • GF (Year 1) – P50 370,780 MWh
    • GF (Year 1) – P90 343,185 MWh

    PPA SPV I and II

    • Project XXXXXXXX I and II
    • Modality Brazilian Auction
    • Average Capacity 33.2 MWavg
    • Term 15 years
    • PPA Supply Period January 2027 – December 2041
    • COD January 2027
    • Price (Base) BRL 171.95 / MWh
    • Indexation IPCA
    • Base Date October 2022
    • Price (as of Dec 2024) BRL 196.41 / MWh

    Further details will be provided upon signing of a non-disclosure agreement (NDA). The transaction price will be determined through negotiations with a willing buyer.

    icon
    Argentina
    Wind farm project (1,350 MW) in Argentina Wind farm project (1,350 MW) in Argentina
    ()
    ()
    ()
    44,000,000 $
    304,320,426 ¥
    icon
    Kazakhstan
    Cascade of two hydroelectric power plants (6+6 MW) in the Almaty region, Kazakhstan Cascade of two hydroelectric power plants (6+6 MW) in the Almaty region, Kazakhstan
    ()
    ()
    ()
    7,500,000 $
    53,173,706 ¥
    icon
    Kazakhstan
    Wind farm power station (5 MW) in Kazakhstan Wind farm power station (5 MW) in Kazakhstan
    ()
    585,000 $
    4,046,079 ¥
    ()
    346,000 $
    2,393,066 ¥
    ()
    4,000,000 $
    27,665,494 ¥