Project of 4 Hydro power plants (33 MW) in Kazakhstan

id - 349
icon
Kazakhstan
Electric power industry
Views: 85
  • Project of 4 Hydro power plants (33 MW) in Kazakhstan
  • Project of 4 Hydro power plants (33 MW) in Kazakhstan
    Project of 4 Hydro power plants (33 MW) in Kazakhstan
  • Revenue (year) No data
    Profit (year) No data
    Payback (mon.)
    Description

    The ready-to-build project of hydro power plants in Kazakhstan is for sale.

    Project overview

    The purpose of the project is the construction of 4x cascade of small HPPs with a total capacity of 33.00 MW

    The project has a local and regional scope. The project is intended to cover the basic part of the electrical load schedules of the Almaty power center, Almaty region of the Republic of Kazakhstan. The cascade on the River consists of 4x small hydropower plants. Each HPP of the cascade is a combination of hydraulic structures and technological equipment, convert the gravitational energy of water into mechanical energy of the flow and then into electrical energy, which is subsequently delivered to consumers.

    Keypoints

    • Status: Ready to Build
    • Project objectives: Construction of a cascade of small HPPs in the Almaty region for: a source of environmentally friendly electricity for supply to consumers in the Almaty region; increasing the reliability of the energy system of the region. – reducing the shortage of electricity in the Almaty region.
    • Installed capacity: 33 MW (Estimated)
    • Electricity generation: 140 GW / Year (Estimated)
    • Electricity tariff with VAT/without VAT: 41,23 Tenge per kWh (0,093 USD / kW)
    • Technology: Hydro units with radial-axial turbines (2x Turbine “Ossberger” for 4 HPPs).

    Market overview

    Kazakhstan has abundant hydro resources, which are mainly concentrated in the eastern and southern parts of the country. Today, 15 large hydropower stations (>50 MW) with a total capacity of 2.25 GW account for up to 13 per cent of the country’s total generating capacity.

    Kazakhstan positions itself as a promising country for the development and implementation of hydropower projects on its territory. The state sets an ambitious plan of achieving the 50% share of electricity production in the country using renewable energy sources by 2050.

    Hydro energy resources are distributed throughout the country, but three areas have particularly large resources: the Irtysh River basin and its main tributaries (Bukhtarma, Uba, Ulba, Kurchum, Kardzhil), the southeast zone with the Ili river basin, and the south zone with the Syrdarya, Talas and Chu river basins.

    The information in the catalog is not an exact offer. The parameters of the deal are specified during negotiations with the seller.

    To perform this action, you must log in or register on the site.
    Start negotiation
    Similar adverts
    icon
    Kazakhstan
    Wind farm power station (5 MW) in Kazakhstan Wind farm power station (5 MW) in Kazakhstan
    Revenue (year)
    585,000 $
    47,296,548 ₽
    Profit (year)
    346,000 $
    27,973,685 ₽
    Payback (mon.)
    Price
    4,000,000 $
    323,395,200 ₽
    icon
    Brazil
    Hydroelectric power station in Brazil Hydroelectric power station in Brazil
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    5,000,000 $
    404,244,000 ₽
    icon
    Kazakhstan
    Wind farm power station (5MW) in Kazakhstan Wind farm power station (5MW) in Kazakhstan
    Revenue (year)
    585,000 $
    47,296,548 ₽
    Profit (year)
    346,000 $
    27,973,685 ₽
    Payback (mon.)
    Price
    4,000,000 $
    323,395,200 ₽
    Currency rates calculator
    Contact REAB
    Contact REAB
    Messengers for this number