Operational Solar PV Power Plant Farm (93.30 MWp) in Argentina

Add to Favorites list
Add to Compare list
id - 520
icon
Argentina
Electric power industry
icon
24
  • Operational Solar PV Power Plant Farm (93.30 MWp) in Argentina
  • Operational Solar PV Power Plant Farm (93.30 MWp) in Argentina
    Operational Solar PV Power Plant Farm (93.30 MWp) in Argentina
  • Revenue (year) No data
    Profit (year) No data
    Payback (mon.)
    Description

    This asset represents a definitive milestone in the region’s energy and infrastructure portfolio. Located within the highly sought-after Andean corridor, the project serves as a cornerstone for industrial-scale resource harvesting. By integrating advanced engineering with one of the most productive meteorological and geological landscapes in the world, the development provides stable, long-term yields and serves as a vital component of the national grid. The project is characterized by its tier-one technical specifications and its ability to maintain peak performance under the rigorous conditions of a high-altitude, cordilleran environment.

    General Data

    • Current status: Operational
    • Installed capacity: 93.30 MWp
    • Export capacity: 80.00 MWac
    • Land use: 203.5 hectares
    • Project company name: ≈≈, S.A.
    • JinkoSolar ownership: 100%
    • Specific yield: 2,560 kWh/kWp
    • Operational life: 30 year

    Financing

    • Financing/Lenders: USD 81.0 M (Senior) IIC, FMO, C2F, BOC; USD 7.5 M (Subordinated) IIC, CIFI
    • Financing tenor: 14 years
    • Financial close date (FC): 23 February 2018

    Technology

    • EPC contractor: Sterling and Wilson Private Ltd. Sucursal Argentina; Sterling and Wilson Private Ltd.; Shapoorji Pallonji and Company Private Ltd.
    • PV modules:  JinkoSolar JKM325PP-72-V (325 Wp)
    • Inverters: Huawei SUN2000-42KTL (42 KWac)
    • Trackers: Convert TRJTH28PDP

    PPA

    • Awarded price: USD 54.1/MWh, adjusted by the Annual Adjustment Factor and the Incentive
    • Factor in accordance with PPA.
    • The first year invoiced PPA price after adjustment is USD 63.28/MWh. Current PPA price (second year) after adjustment is USD 64.36/MWh.

    Tenor: 20 years

    • Offtaker: CAMMESA
    • Lessor: XXXXXXXXXXX, S.A.
    • Lessee: XXXXXXXXXXX, S.A.
    • Property: 203.5 hectares
    • Location: XXXXXXXXXXX, Argentina
    • Term: 30 years starting from the notice of start of works

    Rent:

    • Initial payment when the start of works:  USD 52,500 + VAT
    • Annual lease: USD700 per Ha + VAT
    • Final payment:  USD 52,500 + VAT
    • Termination upon default: Lessor cannot terminate it under any circumstance
    • Penalties: Upon default in timely payment of rent: If default is not cured within 2 months, Lessor has the right to claim the debt to the financing banks
    • Right of first refusal upon transfer: At any time during the term of the contract, Lesser has the right of first refusal to rent (15 days) or buy (60 days) more hectares within the Property

    Assignments

    • Authorized for Lessee
    • Prohibited for Lessor
    • Collateral: Not necessary
    • Applicable Law: Argentinian Law

    Financials

    Fiscal Year End Revenue (USD) Operational Profit (USD) Audit Status
    December 31, 2023 14,560,528 8,848,431 KPMG Audit
    December 31, 2022 14,043,494 7,252,243 KPMG Audit
    December 31, 2021 14,341,470 7,794,800 KPMG Audit
    December 31, 2020 13,772,312 10,052,359 KPMG Audit

    The information in the catalog is not an exact offer. The parameters of the deal are specified during negotiations with the seller.

    To perform this action, you must log in or register on the site.
    Start negotiation
    Price
    85,000,000 $
    6,052,765,000 ₽
    To perform this action, you must log in or register on the site.
    Start negotiation
    icon Useful tip

    This website can automatically make regular searches in the catalog according to your conditions and send you the results. For subscribing, you need to register on the site.

    Similar adverts
    icon
    Kazakhstan
    Wind farm power station (5 MW) in Kazakhstan Wind farm power station (5 MW) in Kazakhstan
    Revenue (year)
    585,000 $
    41,657,265 ₽
    Profit (year)
    346,000 $
    24,638,314 ₽
    Payback (mon.)
    Price
    4,000,000 $
    284,836,000 ₽
    icon
    Brazil
    Hydroelectric power station in Brazil Hydroelectric power station in Brazil
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    5,000,000 $
    356,045,000 ₽
    icon
    Kyrgyzstan
    Hydro power plant (5,4MW) in Kyrgyzstan Hydro power plant (5,4MW) in Kyrgyzstan
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    80
    Price
    8,990,000 $
    640,168,910 ₽
    Currency rates calculator
    Contact REAB
    Contact REAB
    Messengers for this number