Solar power plant (150 MW) project in Montenegro

Add to Favorites list
Add to Compare list
id - 407
icon
Montenegro
Electric power industry
icon
4
  • Solar power plant (150 MW) project in Montenegro
  • Solar power plant (150 MW) project in Montenegro
    Solar power plant (150 MW) project in Montenegro
  • Revenue (year) No data
    Profit (year) No data
    Payback (mon.)
    Description

    Montenegro, a small Balkan country, is increasingly embracing solar energy as a key component of its renewable energy strategy. With abundant sunshine throughout the year, the potential for solar projects is significant. The Montenegrin government has introduced various incentives to encourage investment in solar energy, including feed-in tariffs and support for photovoltaic installations.

    Notable projects include the large-scale solar power plant in Crnogorski, which aims to contribute substantially to the national grid. Smaller-scale solar initiatives, including rooftop installations on residential and commercial buildings, are also gaining traction, promoting energy independence and sustainability.

    Moreover, Montenegro’s commitment to EU integration has spurred developments in renewable technologies, aligning with European energy policies. This focus on solar energy not only helps diversify the energy mix but also mitigates environmental impacts, contributing to the country’s goal of reducing greenhouse gas emissions. As awareness and investment grow, Montenegro is poised to become a regional leader in solar energy utilization.

    Overview

    150MW solar power project, located in Montenegro for sale, which covers over 100 hectares of land with a southern orientation and up to a 5% slope. The project is in the “Ready to Build” (RTB) phase and offers a connection to a Transmission System Operator (TSO) grid line close to the site, with a 150+ MWp grid permit.

    Keypoints

    • Location: Montenegro
    • Land: 100+ hectares with a long-term lease or purchase option (35 years)
    • Solar Production: Expected 1,470 kWh/kWp, with an 80% performance ratio
    • Development Stage: Grid connection completion expected in Q4 2024; building permits projected by Q4 2025
    • Power Purchase Agreement (PPA): Currently not in place, though possible government grid operator buyout is an option.

    Details will be provided upon signing the NDA. The price of the business will be determined through negotiations with a willing buyer.

    The information in the catalog is not an exact offer. The parameters of the deal are specified during negotiations with the seller.

    To perform this action, you must log in or register on the site.
    Start negotiation
    Price
    No data
    To perform this action, you must log in or register on the site.
    Start negotiation
    icon Useful tip

    Interested in an ad in the catalog? To avoid losing it and easily find it in the future, add it to "Favorites". To do this, click the heart icon in the upper right corner of the card or ad page.

    Similar adverts
    icon
    Brazil
    Project of 14.7MW Hydro power plant in Brazil Project of 14.7MW Hydro power plant in Brazil
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    3,500,000 $
    284,498,200 ₽
    icon
    Kazakhstan
    Project of 4 Hydro power plants (33 MW) in Kazakhstan Project of 4 Hydro power plants (33 MW) in Kazakhstan
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    12,500,000 $
    1,016,065,000 ₽
    icon
    Kazakhstan
    Wind farm power station (5 MW) in Kazakhstan Wind farm power station (5 MW) in Kazakhstan
    Revenue (year)
    585,000 $
    47,551,842 ₽
    Profit (year)
    346,000 $
    28,124,680 ₽
    Payback (mon.)
    Price
    4,000,000 $
    325,140,800 ₽
    Currency rates calculator
    Contact REAB
    Contact REAB
    Messengers for this number