Anthropogenic Gold Deposit in Kyrgyzstan

id - 598
icon
Kyrgyzstan
Mining industry
icon
14
  • Anthropogenic Gold Deposit in Kyrgyzstan
  • Anthropogenic Gold Deposit in Kyrgyzstan
    Anthropogenic Gold Deposit in Kyrgyzstan
  • ()
    ()
    ()

    An investor is sought for a gold extraction project at an anthropogenic deposit located in the tailings facility of a state-owned gold processing plant in Kyrgyzstan. Advantages of this extraction method include minimal costs, existing infrastructure, and a rapid startup.

    Reserves

    • Total material volume: 10 million tonnes
    • Confirmed gold content: 5 tonnes
    • Grade: 0.5 g/t; recovery rate: 70%

    Work Completed

    1. Exploration and surveys conducted.
    2. Extraction project approved.
    3. Power supply available from the operating plant.
    4. Road access and utilities in place.

    Partnership Terms

    1. 31% — State
    2. 18% — License holder (provides administrative support for the tender and production organization)
    3. 51% — Investor

    Required Funds

    • Tender application: $57,000 security deposit (refundable)
    • Contribution: $200,000 (non-refundable)

    Operations can commence following the tender.

    Details provided upon signing an NDA; negotiations to follow confirmation of funds.

    icon
    Russia
    Iron ore deposit in the Southern Urals, Russia Iron ore deposit in the Southern Urals, Russia
    ()
    200,000,000 ₽
    15,914,698 ¥
    ()
    50,000,000 ₽
    3,978,675 ¥
    ()
    120
    500,000,000 ₽
    39,786,744 ¥
    icon
    DR Congo
    Copper-cobalt mining in DR Congo Copper-cobalt mining in DR Congo
    ()
    ()
    ()
    50,000,000 $
    334,994,430 ¥
    icon
    Russia
    Sand quarry and quartz sand deposit in the Ryazan region, Russia Sand quarry and quartz sand deposit in the Ryazan region, Russia
    Fast deal
    ()
    ()
    ()
    500,000,000 ₽
    39,786,744 ¥
    Contact REAB