Anthropogenic Gold Deposit in Kyrgyzstan

id - 598
icon
Kyrgyzstan
Mining industry
icon
9
  • Anthropogenic Gold Deposit in Kyrgyzstan
  • Anthropogenic Gold Deposit in Kyrgyzstan
    Anthropogenic Gold Deposit in Kyrgyzstan
  • ()
    ()
    ()

    An investor is sought for a gold extraction project at an anthropogenic deposit located in the tailings facility of a state-owned gold processing plant in Kyrgyzstan. Advantages of this extraction method include minimal costs, existing infrastructure, and a rapid startup.

    Reserves

    • Total material volume: 10 million tonnes
    • Confirmed gold content: 5 tonnes
    • Grade: 0.5 g/t; recovery rate: 70%

    Work Completed

    1. Exploration and surveys conducted.
    2. Extraction project approved.
    3. Power supply available from the operating plant.
    4. Road access and utilities in place.

    Partnership Terms

    1. 31% — State
    2. 18% — License holder (provides administrative support for the tender and production organization)
    3. 51% — Investor

    Required Funds

    • Tender application: $57,000 security deposit (refundable)
    • Contribution: $200,000 (non-refundable)

    Operations can commence following the tender.

    Details provided upon signing an NDA; negotiations to follow confirmation of funds.

    icon
    Russia
    Gold and platinum deposit in the Sverdlovsk region, Russia Gold and platinum deposit in the Sverdlovsk region, Russia
    ()
    ()
    ()
    900,000,000 ₽
    71,616,138 ¥
    icon
    Russia
    90% stake in a gold deposit in the Chelyabinsk region, Russia 90% stake in a gold deposit in the Chelyabinsk region, Russia
    ()
    ()
    ()
    550,000,000 ₽
    43,765,418 ¥
    icon
    Ghana
    Investment in a gold mining project in Ghana Investment in a gold mining project in Ghana
    ()
    ()
    ()
    45,000,000 $
    301,494,987 ¥
    Contact REAB