Dolerite deposit in the Irkutsk Region, Russia

id - 591
icon
Russia
Mining industry
icon
70
  • Dolerite deposit in the Irkutsk Region, Russia
  • Dolerite deposit in the Irkutsk Region, Russia
  • Dolerite deposit in the Irkutsk Region, Russia
  • Dolerite deposit in the Irkutsk Region, Russia
  • Dolerite deposit in the Irkutsk Region, Russia
  • Dolerite deposit in the Irkutsk Region, Russia
    Dolerite deposit in the Irkutsk Region, Russia
  • Dolerite deposit in the Irkutsk Region, Russia
    Dolerite deposit in the Irkutsk Region, Russia
  • Dolerite deposit in the Irkutsk Region, Russia
    Dolerite deposit in the Irkutsk Region, Russia
  • Dolerite deposit in the Irkutsk Region, Russia
    Dolerite deposit in the Irkutsk Region, Russia
  • Dolerite deposit in the Irkutsk Region, Russia
    Dolerite deposit in the Irkutsk Region, Russia
  • ()
    ()
    ()

    The dolerite deposit is situated in a geographically and economically advantageous location in the Irkutsk Region, Russian Federation. A valid subsoil use license is in place, valid until 2040.

    Products

    • Dolerite is used in architecture and for street paving, as well as in the manufacture of facing tiles, curbstones, paving stones, countertops, windowsills, fireplaces, etc.
    • It can be used as a construction and facing material.
    • It is suitable for producing memorial plaques, monuments, and memorial complexes.
    • It features a dense, homogeneous structure and a black color; after polishing, the surface is free of spots and streaks.

    Reserves

    • Approved reserves stand at 1,984,000 m³ of dolerite and 640,000 m³ of overburden.
    • If the extraction level is lowered, the deposit's reserves total 10,000,000 m³.
    • The production cost is 17.5 rubles per tonne, while the market price starts at 3,500 rubles per tonne.
    • Test results confirm suitability for use in roadbed construction.
    • In terms of physical and mechanical properties, the crushed stone meets GOST 31436-2011 standards: crushing strength grade 1400, abrasion resistance grade I-I, and frost resistance grade F400.

    Project Status and Infrastructure

    • Full documentation package available. Fully prepared for extraction; the 2026 geological exploration and development plan has been approved.
    • All geological, environmental, and other required reports have been submitted.
    • Forest clearing operations have been completed.
    • Overburden removal has been completed.
    • The 10 km access road to the deposit is ready for operation and the passage of oversized machinery.

    Transaction Structure

    Sale of a 100% equity interest in the Company. An NDA must be signed to obtain further details.

    icon
    Turkiye
    Chrome ore production business in Turkiye Chrome ore production business in Turkiye
    ()
    9,500,000 $
    63,648,942 ¥
    ()
    2,500,000 $
    16,749,722 ¥
    ()
    17,500,000 $
    117,248,051 ¥
    icon
    Uganda
    Gold mine in Uganda Gold mine in Uganda
    REAB-premium
    ()
    ()
    ()
    22,000,000 $
    147,397,550 ¥
    icon
    DR Congo
    Copper-cobalt mining in DR Congo Copper-cobalt mining in DR Congo
    ()
    ()
    ()
    50,000,000 $
    334,994,430 ¥
    Contact REAB