Gold deposit in Kyrgyzstan

id - 187
icon
Kyrgyzstan
Mining industry
icon
203
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • ()
    ()
    ()

    A primary (hard rock) and placer gold deposit in the Kyrgyz Republic is for sale. A subsoil use license is available until 2029, along with a geological exploration project plan, an expert review, and a positive expert opinion, as well as geological report data.

    The exploration area has been known to be gold-bearing since the late 19th century. The work carried out made it possible to identify promising areas for in-depth exploration and future production.

    Including the following:

    • topographic and geodetic works and reconnaissance
    • a dirt road was laid to the site
    • road cut sampling
    • ditch sampling
    • channel and linear-spot sampling
    • laboratory studies

    Deposit characteristics:

    • the area of ​​the license area is 2,501 hectares.
    • projected resources in category P1 are estimated at 17 t at ore occurrences, of which 12 t are 1 g/t and 5 t are 10 g/t.
    • The overall gold ore potential of the field is 94 t.
    • The ore field retains potential for expanding gold resources, primarily through further exploration of the deposit's deep horizons.

    Required Work:

    • Further exploration work and resource registration in categories C1/C2 (investment of approximately $2 million).
    • Power connection (30 km to the power line)
    • Commencement of production

    icon
    Kazakhstan
    Lithium deposit mining in Kazakhstan Lithium deposit mining in Kazakhstan
    ()
    ()
    ()
    6,000,000 $
    42,915,632 ¥
    icon
    Kazakhstan
    Copper mining business with a SX-EW plant in Kazakhstan Copper mining business with a SX-EW plant in Kazakhstan
    ()
    ()
    ()
    100,000,000 $
    715,260,521 ¥
    icon
    Turkiye
    Chrome ore production business in Turkiye Chrome ore production business in Turkiye
    ()
    9,500,000 $
    67,949,750 ¥
    ()
    2,500,000 $
    17,881,514 ¥
    ()
    17,500,000 $
    125,170,592 ¥