Gold deposit in Kyrgyzstan

id - 187
icon
Kyrgyzstan
Mining industry
icon
190
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • ()
    ()
    ()

    A primary (hard rock) and placer gold deposit in the Kyrgyz Republic is for sale. A subsoil use license is available until 2029, along with a geological exploration project plan, an expert review, and a positive expert opinion, as well as geological report data.

    The exploration area has been known to be gold-bearing since the late 19th century. The work carried out made it possible to identify promising areas for in-depth exploration and future production.

    Including the following:

    • topographic and geodetic works and reconnaissance
    • a dirt road was laid to the site
    • road cut sampling
    • ditch sampling
    • channel and linear-spot sampling
    • laboratory studies

    Deposit characteristics:

    • the area of ​​the license area is 2,501 hectares.
    • projected resources in category P1 are estimated at 17 t at ore occurrences, of which 12 t are 1 g/t and 5 t are 10 g/t.
    • The overall gold ore potential of the field is 94 t.
    • The ore field retains potential for expanding gold resources, primarily through further exploration of the deposit's deep horizons.

    Required Work:

    • Further exploration work and resource registration in categories C1/C2 (investment of approximately $2 million).
    • Power connection (30 km to the power line)
    • Commencement of production

    icon
    DR Congo
    Diamond mine in DR Congo Diamond mine in DR Congo
    REAB-premium
    ()
    ()
    ()
    260,000,000 $
    1,859,677,355 ¥
    icon
    Russia
    Gold deposit in Khakassia, Russia Gold deposit in Khakassia, Russia
    ()
    ()
    ()
    850,000,000 ₽
    74,849,641 ¥
    icon
    Kyrgyzstan
    Travertine deposit in Kyrgyzstan Travertine deposit in Kyrgyzstan
    ()
    ()
    ()
    2,500,000 $
    17,881,514 ¥