Industrial photovoltaic park project (400 MW) in Romania

id - 426
icon
Romania
Electric power industry
icon
61
  • Industrial photovoltaic park project (400 MW) in Romania
  • Industrial photovoltaic park project (400 MW) in Romania
    Industrial photovoltaic park project (400 MW) in Romania
  • ()
    ()
    () 60

    This opportunity presents a shovel-ready, utility-scale photovoltaic (PV) park project located in the highly strategic Western region of Romania, a dominant market for renewable energy in Central and Eastern Europe (CEE).

    Key Development & Permitting Milestones

    The project significantly de-risked and is positioned for immediate construction:

    • Land Security: 100% of the necessary land (442 hectares) has been secured through lease and concession contracts for a long-term duration of 30 – 49 years.
    • Permits Obtained: Both the Urbanism Certificates and the critical Grid Connection Permit (ATR) have been secured from Transelectrica (the National Transmission System Operator).
    • High-Voltage Grid Access: The connection point is confirmed and established on the high-capacity 400 kV Arad–Mintia transmission line.

    Technical Specifications & Future Upside

    • Configuration: The park will utilize a total of 732,137 high-efficiency panels (rated at 585 W each) and 1,980 inverters.
    • Specific Yield: The location benefits from high solar irradiation, resulting in an expected specific yield of 1,600 MWh/year
    • Optional Hybrid Phase: The project design is future-proofed with the option to integrate a Battery Energy Storage System (BESS) of up to 100 MWh, adding significant operational flexibility and potential revenue streams.

    Financial Projections (Estimated)

    The project offers highly attractive financial returns indicative of a premium, large-scale asset in the EU market:

    • Total Annual Energy Production: 640,000 MWh/year (640 GWh)
    • Estimated Annual Revenue: 51–57 million EUR/year
    • Estimated CAPEX: 200 million EUR
    • Estimated Payback Period: 4–5 years

    This opportunity offers international investors a direct pathway to acquire a large-scale, de-risked, and bankable asset contributing to one of the fastest-growing renewable energy markets in Europe.

    icon
    Romania
    Solar photovoltaic power plant (108 MW) in Romania Solar photovoltaic power plant (108 MW) in Romania
    ()
    ()
    ()
    8,640,000 €
    71,585,704 ¥
    icon
    Turkiye
    Photovoltaic solar power plants (48,2 MWp) in Turkiye Photovoltaic solar power plants (48,2 MWp) in Turkiye
    ()
    10,000,000 $
    69,750,527 ¥
    ()
    ()
    55,500,000 $
    387,115,421 ¥
    icon
    Bosnia and Herzegovina
    Photovoltaic power plant in Bosnia and Herzegovina Photovoltaic power plant in Bosnia and Herzegovina
    ()
    ()
    ()
    20,674,000 €
    171,291,996 ¥
    icon
    Serbia
    Bottled water and non-alcoholic beverages factory in Serbia Bottled water and non-alcoholic beverages factory in Serbia
    8,500,000 $
    59,287,948 ¥