Operational Solar PV Power Plant Farm (93.30 MWp) in Argentina

id - 520
icon
Argentina
Electric power industry
icon
18
  • Operational Solar PV Power Plant Farm (93.30 MWp) in Argentina
  • Operational Solar PV Power Plant Farm (93.30 MWp) in Argentina
    Operational Solar PV Power Plant Farm (93.30 MWp) in Argentina
  • ()
    ()
    ()

    This asset represents a definitive milestone in the region’s energy and infrastructure portfolio. Located within the highly sought-after Andean corridor, the project serves as a cornerstone for industrial-scale resource harvesting. By integrating advanced engineering with one of the most productive meteorological and geological landscapes in the world, the development provides stable, long-term yields and serves as a vital component of the national grid. The project is characterized by its tier-one technical specifications and its ability to maintain peak performance under the rigorous conditions of a high-altitude, cordilleran environment.

    General Data

    • Current status: Operational
    • Installed capacity: 93.30 MWp
    • Export capacity: 80.00 MWac
    • Land use: 203.5 hectares
    • Project company name: ≈≈, S.A.
    • JinkoSolar ownership: 100%
    • Specific yield: 2,560 kWh/kWp
    • Operational life: 30 year

    Financing

    • Financing/Lenders: USD 81.0 M (Senior) IIC, FMO, C2F, BOC; USD 7.5 M (Subordinated) IIC, CIFI
    • Financing tenor: 14 years
    • Financial close date (FC): 23 February 2018

    Technology

    • EPC contractor: Sterling and Wilson Private Ltd. Sucursal Argentina; Sterling and Wilson Private Ltd.; Shapoorji Pallonji and Company Private Ltd.
    • PV modules:  JinkoSolar JKM325PP-72-V (325 Wp)
    • Inverters: Huawei SUN2000-42KTL (42 KWac)
    • Trackers: Convert TRJTH28PDP

    PPA

    • Awarded price: USD 54.1/MWh, adjusted by the Annual Adjustment Factor and the Incentive
    • Factor in accordance with PPA.
    • The first year invoiced PPA price after adjustment is USD 63.28/MWh. Current PPA price (second year) after adjustment is USD 64.36/MWh.

    Tenor: 20 years

    • Offtaker: CAMMESA
    • Lessor: XXXXXXXXXXX, S.A.
    • Lessee: XXXXXXXXXXX, S.A.
    • Property: 203.5 hectares
    • Location: XXXXXXXXXXX, Argentina
    • Term: 30 years starting from the notice of start of works

    Rent:

    • Initial payment when the start of works:  USD 52,500 + VAT
    • Annual lease: USD700 per Ha + VAT
    • Final payment:  USD 52,500 + VAT
    • Termination upon default: Lessor cannot terminate it under any circumstance
    • Penalties: Upon default in timely payment of rent: If default is not cured within 2 months, Lessor has the right to claim the debt to the financing banks
    • Right of first refusal upon transfer: At any time during the term of the contract, Lesser has the right of first refusal to rent (15 days) or buy (60 days) more hectares within the Property

    Assignments

    • Authorized for Lessee
    • Prohibited for Lessor
    • Collateral: Not necessary
    • Applicable Law: Argentinian Law

    Financials

    Fiscal Year End Revenue (USD) Operational Profit (USD) Audit Status
    December 31, 2023 14,560,528 8,848,431 KPMG Audit
    December 31, 2022 14,043,494 7,252,243 KPMG Audit
    December 31, 2021 14,341,470 7,794,800 KPMG Audit
    December 31, 2020 13,772,312 10,052,359 KPMG Audit

    icon
    Romania
    Solar photovoltaic power plant (108 MW) in Romania Solar photovoltaic power plant (108 MW) in Romania
    ()
    ()
    ()
    8,640,000 €
    68,213,867 ¥
    icon
    Montenegro
    Solar power plant (150 MW) project in Montenegro Solar power plant (150 MW) project in Montenegro
    ()
    ()
    ()
    icon
    Romania
    Industrial photovoltaic park project (400 MW) in Romania Industrial photovoltaic park project (400 MW) in Romania
    ()
    ()
    ()
    60
    28,000,000 €
    221,063,457 ¥
    Contact REAB