Limestone and expanded clay quarry in the Kaluga region, Russia

id - 471
icon
Russia
Mining industry
icon
26
  • Limestone and expanded clay quarry in the Kaluga region, Russia
  • Limestone and expanded clay quarry in the Kaluga region, Russia
  • Limestone and expanded clay quarry in the Kaluga region, Russia
  • Limestone and expanded clay quarry in the Kaluga region, Russia
    Limestone and expanded clay quarry in the Kaluga region, Russia
  • Limestone and expanded clay quarry in the Kaluga region, Russia
    Limestone and expanded clay quarry in the Kaluga region, Russia
  • Limestone and expanded clay quarry in the Kaluga region, Russia
    Limestone and expanded clay quarry in the Kaluga region, Russia
  • Fast deal
    () 1,080,000,000 ₽
    96,841,011 ¥
    () 120,000,000 ₽
    10,760,113 ¥
    () 48

    For sale: Operating quarry (limestone + expanded clay) in the Kaluga region, Russia. The quarry, with its existing reserves and infrastructure, is an excellent investment opportunity with profitability and a quick payback period. Documents are ready, land use and development regulations have been approved, and public hearings have been completed. Ideal for investors, construction companies, and manufacturing holdings.

    Mineral reserves:

    Limestone:

    • Profitable reserves: 11.5 million m³ (29 million tons)
    • Off-balance sheet — 7.5 million m³ (19 million tons)
    • Strength: 600–1000
    • Prepared area: 8 hectares
    • Production potential — up to 500,000 tons of crushed stone

    Expanded clay:

    • Reserves — 2 million m³ (3.8 million tons)
    • Supplies to plants in the Moscow, Kaluga, Tula and Ryazan regions

    Land fund:

    • 59 hectares — Industrial land (for quarry development, waste heaps, waste sorting plants, warehouses)
    • 320 hectares - agricultural land (involved in circulation, transfer possible)
    • All plots are owned

    Production base:

    • A crushing and screening plant with a capacity of 250-300 tons/hour has been installed
    • Specialized machinery and production equipment available (part owned, part leased)
    • Utilities:
    • Electricity supply 10 kV, capacity 630 kVA (possibility of increasing to 2 MW)
    • High pressure gas
    • Gas limit - Up to 1000 m³/hour
    • On-site production of lime and mineral powders is possible

    Logistics:

    • Convenient paved access roads
    • Regional and federal highways nearby

    Advantages:

    • Operating quarry
    • Prepared stockpiles
    • Ready-made infrastructure
    • Connected utilities
    • Minimal transportation costs
    • High demand for products
    • Established customer base
    • Product supply contracts

    Detailed information will be provided to interested parties after signing an NDA.

    icon
    DR Congo
    Copper-cobalt mining in DR Congo Copper-cobalt mining in DR Congo
    ()
    ()
    ()
    50,000,000 $
    346,091,838 ¥
    icon
    Kyrgyzstan
    Two polymetallic deposits (gold, silver, copper, and cobalt) in Kyrgyzstan Two polymetallic deposits (gold, silver, copper, and cobalt) in Kyrgyzstan
    ()
    ()
    ()
    23,000,000 $
    159,202,246 ¥
    icon
    Venezuela
    Coltan and Rare Earth Metals Deposit in Venezuela Coltan and Rare Earth Metals Deposit in Venezuela
    REAB-premium
    ()
    ()
    ()
    4,400,000 $
    31,194,108 ¥