An investor is sought for a gold extraction project at an anthropogenic deposit located in the tailings facility of a state-owned gold processing plant in Kyrgyzstan. Advantages of this extraction method include minimal costs, existing infrastructure, and a rapid startup.
Reserves
- Total material volume: 10 million tonnes
- Confirmed gold content: 5 tonnes
- Grade: 0.5 g/t; recovery rate: 70%
Work Completed
- Exploration and surveys conducted.
- Extraction project approved.
- Power supply available from the operating plant.
- Road access and utilities in place.
Partnership Terms
- 31% — State
- 18% — License holder (provides administrative support for the tender and production organization)
- 51% — Investor
Required Funds
- Tender application: $57,000 security deposit (refundable)
- Contribution: $200,000 (non-refundable)
Operations can commence following the tender.
Details provided upon signing an NDA; negotiations to follow confirmation of funds.