Anthropogenic Gold Deposit in Kyrgyzstan

id - 598
icon
Kyrgyzstan
Mining industry
icon
23
  • Anthropogenic Gold Deposit in Kyrgyzstan
  • Anthropogenic Gold Deposit in Kyrgyzstan
    Anthropogenic Gold Deposit in Kyrgyzstan
  • ()
    ()
    ()

    An investor is sought for a gold extraction project at an anthropogenic deposit located in the tailings facility of a state-owned gold processing plant in Kyrgyzstan. Advantages of this extraction method include minimal costs, existing infrastructure, and a rapid startup.

    Reserves

    • Total material volume: 10 million tonnes
    • Confirmed gold content: 5 tonnes
    • Grade: 0.5 g/t; recovery rate: 70%

    Work Completed

    1. Exploration and surveys conducted.
    2. Extraction project approved.
    3. Power supply available from the operating plant.
    4. Road access and utilities in place.

    Partnership Terms

    1. 31% — State
    2. 18% — License holder (provides administrative support for the tender and production organization)
    3. 51% — Investor

    Required Funds

    • Tender application: $57,000 security deposit (refundable)
    • Contribution: $200,000 (non-refundable)

    Operations can commence following the tender.

    Details provided upon signing an NDA; negotiations to follow confirmation of funds.

    icon
    Saudi Arabia
    Gold, silicon and iron ore mining project in Saudi Arabia Gold, silicon and iron ore mining project in Saudi Arabia
    ()
    ()
    ()
    16,000,000 $
    107,198,218 ¥
    icon
    Uganda
    Gold mine in Uganda Gold mine in Uganda
    REAB-premium
    ()
    ()
    ()
    22,000,000 $
    147,397,550 ¥
    icon
    Russia
    Stake in a gold mining company in Bashkortostan, Russia Stake in a gold mining company in Bashkortostan, Russia
    Fast deal
    ()
    ()
    ()
    750,000,000 ₽
    59,680,115 ¥
    Contact REAB