Operational Wind Power Plant (5 MW) in Kazakhstan

id - 342
icon
Kazakhstan
Electric power industry
icon
13
  • Operational Wind Power Plant (5 MW) in Kazakhstan
  • Operational Wind Power Plant (5 MW) in Kazakhstan
    Operational Wind Power Plant (5 MW) in Kazakhstan
  • () 537,000 €
    4,444,790 ¥
    () 318,000 €
    2,632,111 ¥
    ()

    An operational wind energy generation business located in the Republic of Kazakhstan, offering investors a rare opportunity to acquire a fully functioning renewable energy asset with stable returns, government-backed tariffs, and proven production performance.

    Core Highlights

    • Active government-backed PPA until 2034.
    • Established wind farm in western Kazakhstan, operating since 2019.
    • 5 MW of installed capacity using European-manufactured turbines.
    • Strategically positioned near the Caspian Sea, in a high-wind corridor close to Aktau.
    • Fully staffed with a locally trained operations team and robust technical oversight.
    • Operating under a legally established Kazakhstani entity with a history dating to 2015.

    Financial Performance

    • Consistent cash flow from long-term electricity sales under the state’s renewable energy scheme.
    • Regular maintenance and spare parts stock ensure uninterrupted operations.
    • No Debt.

    Asset Details

    • 1 x Enercon E-70 E4 (2.0 MW) – Germany.
    • 2 x Micon NM-1500C/64 (1.5 MW each) – Denmark.
    • Located in open terrain near the sea, benefiting from favorable and consistent wind flows.
    • Site selected based on long-term meteorological data and wind rose studies.
    • Fully compliant with Kazakhstan’s industrial and environmental safety standards.

    Revenue Model

    • Electricity sold to the Settlement and Financial Center (RFC) at a state-guaranteed green tariff.
    • 15-year Power Purchase Agreement (PPA) in place from 2019 to 2034, with annual indexation.
    • 2024 fixed tariff: 34.74 KZT/kWh (~€0.067)
    • Backed by Kazakhstan’s Renewable Energy Law.

    Valuation Estimates

    • EV/EBITDA-based valuation: ~€3.8 million.
    • Installed capacity-based valuation: ~€5.9 million.
    • Sale includes full company ownership, permits, land rights, equipment, infrastructure, and personnel.

    4,900,000 €
    40,557,671 ¥
    icon

    Want to convert the amount into another currency at the rate? On the catalog pages, at the bottom right, there is a button with currency icons, it opens a calculator. Our website has more than 20 currencies with daily recalculation of the rate.

    icon
    Kazakhstan
    Wind farm power station (5 MW) in Kazakhstan Wind farm power station (5 MW) in Kazakhstan
    ()
    585,000 $
    4,180,033 ¥
    ()
    346,000 $
    2,472,293 ¥
    ()
    4,000,000 $
    28,581,417 ¥
    icon
    Kazakhstan
    Wind farm power station (5MW) in Kazakhstan Wind farm power station (5MW) in Kazakhstan
    ()
    585,000 $
    4,180,033 ¥
    ()
    346,000 $
    2,472,293 ¥
    ()
    4,000,000 $
    28,581,417 ¥
    icon
    Kazakhstan
    Project of 4 Hydro power plants (33 MW) in Kazakhstan Project of 4 Hydro power plants (33 MW) in Kazakhstan
    ()
    ()
    ()
    12,500,000 $
    89,316,926 ¥