Production complex of building materials in Pavlodar, Kazakhstan

id - 155
icon
Kazakhstan
Building materials and metal structures
icon
48
  • Production complex of building materials in Pavlodar, Kazakhstan
  • Production complex of building materials in Pavlodar, Kazakhstan
  • Production complex of building materials in Pavlodar, Kazakhstan
  • Production complex of building materials in Pavlodar, Kazakhstan
  • Production complex of building materials in Pavlodar, Kazakhstan
  • Production complex of building materials in Pavlodar, Kazakhstan
    Production complex of building materials in Pavlodar, Kazakhstan
  • Production complex of building materials in Pavlodar, Kazakhstan
    Production complex of building materials in Pavlodar, Kazakhstan
  • Production complex of building materials in Pavlodar, Kazakhstan
    Production complex of building materials in Pavlodar, Kazakhstan
  • Production complex of building materials in Pavlodar, Kazakhstan
    Production complex of building materials in Pavlodar, Kazakhstan
  • Production complex of building materials in Pavlodar, Kazakhstan
    Production complex of building materials in Pavlodar, Kazakhstan
  • Fast deal
    () 100,000,000 ₽
    8,815,622 ¥
    ()
    ()

    The operating complex for the production of building materials in Pavlodar, Republic of Kazakhstan is for sale. The production has the necessary environmental permits, and the products have necessary certificates.

    The production complex includes:

    • plant for the production of white sand-lime brick
    • plant for the production of ready-mixed concrete of all brands
    • two factories for the production of quicklime of all grades
    • 3 land plots for lease with the right to extend or purchase, with a total area of 7.33 hectares
    • railway sidings — 2 branches: 1 elevated path for unloading inert material, 2 path to the finished product warehouse
    • paved automobile access road
    • vehicle scales with a lifting capacity of 100 t

    Details about production:

    Plant for the production of white sand-lime brick

    The complex is a fully functional system, from the preparation of inert materials to the steaming of products. There is all the necessary equipment: bunkers equipped with vibrators, a jaw crusher, a ball mill, a screen, 4 silos for storing inert materials, 2 full-fledged material supply systems for pressing, 1 automated and 1 manual press, 4 autoclaves with a diameter of 2.2 meters, a boiler in complete with water treatment and deaerator, compressor, etc.

    Pressing equipment DORSTENER 400S, Germany.

    Productivity of more than 7 million bricks per year.

    Horizontal type concrete plant

    The concrete plant includes a full complex from the Italian company IMER Group with a computer control system. Mixing plant: ORU 4500/3000. There are 2 silos with a capacity of 380 tons each. Plant productivity per hour — 120 m3.

    Quicklime production plant No. 1

    The products are used for the production of aerated concrete and sand-lime brick. The products have certificates of conformity for grades 1, 2 and 3, a safety data sheet and other documents confirming the conformity of the products. 60% workload for the production of 1st grade quicklime.

    The plant is equipped with a 50-meter horizontal furnace, diameter 2.2 m. Equipment ZHENGZHOU SINOWATT MACHINERY CO, China.

    Productivity more than 30,000 tons per year.

    Quicklime production plant No. 2 (6 shaft kilns)

    Products of category 3. It is used in the production of sand-lime brick. At the moment the plant operates only for its own needs.

    460,000,000 ₽
    40,551,858 ¥
    icon

    You can view prices for objects in the catalog and its basic business indicators in two currencies. The first one is the original currency set by the seller. The second one you can choose yourself. It's calculated by the rate of the Central Bank of the Russian Federation.

    icon
    Kazakhstan
    Metal structures plant in Almaty, Kazakhstan Metal structures plant in Almaty, Kazakhstan
    Audit done
    ()
    ()
    ()
    6,000,000 $
    42,835,140 ¥
    icon
    Russia
    Reinforced concrete plant or land plot in the city center, Belgorod, Russia Reinforced concrete plant or land plot in the city center, Belgorod, Russia
    Urgent!
    330,000,000 ₽
    29,091,551 ¥
    icon
    Kazakhstan
    Lithium deposit mining in Kazakhstan Lithium deposit mining in Kazakhstan
    6,000,000 $
    42,835,140 ¥
    icon
    Kazakhstan
    Project of 4 Hydro power plants (33 MW) in Kazakhstan Project of 4 Hydro power plants (33 MW) in Kazakhstan
    12,500,000 $
    89,239,874 ¥