Gold deposit in Kyrgyzstan

Add to Favorites list
Add to Compare list
id - 187
icon
Kyrgyzstan
Mining industry
icon
670
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Gold deposit in Kyrgyzstan
    Gold deposit in Kyrgyzstan
  • Revenue (year) No data
    Profit (year) No data
    Payback (mon.)
    Description

    A primary (hard rock) and placer gold deposit in the Kyrgyz Republic is for sale. A subsoil use license is available until 2029, along with a geological exploration project plan, an expert review, and a positive expert opinion, as well as geological report data.

    The exploration area has been known to be gold-bearing since the late 19th century. The work carried out made it possible to identify promising areas for in-depth exploration and future production.

    Including the following:

    • topographic and geodetic works and reconnaissance
    • a dirt road was laid to the site
    • road cut sampling
    • ditch sampling
    • channel and linear-spot sampling
    • laboratory studies

    Deposit characteristics:

    • the area of ​​the license area is 2,501 hectares.
    • projected resources in category P1 are estimated at 17 t at ore occurrences, of which 12 t are 1 g/t and 5 t are 10 g/t.
    • The overall gold ore potential of the field is 94 t.
    • The ore field retains potential for expanding gold resources, primarily through further exploration of the deposit's deep horizons.

    Required Work:

    • Further exploration work and resource registration in categories C1/C2 (investment of approximately $2 million).
    • Power connection (30 km to the power line)
    • Commencement of production

    The information in the catalog is not an exact offer. The parameters of the deal are specified during negotiations with the seller.

    To perform this action, you must log in or register on the site.
    Start negotiation
    Similar adverts
    icon
    Kyrgyzstan
    Travertine deposit in Kyrgyzstan Travertine deposit in Kyrgyzstan
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    2,500,000 $
    203,869,500 ₽
    icon
    DR Congo
    Gold deposit in DR Congo Gold deposit in DR Congo
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    14,000,000 $
    1,141,669,200 ₽
    icon
    Tanzania
    Gold deposit in Tanzania Gold deposit in Tanzania
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    7,000,000 $
    570,834,600 ₽
    Previously viewed
    icon
    Georgia
    Agricultural factory in Georgia Agricultural factory in Georgia
    Fast deal
    Price
    3,700,000 $
    301,726,860 ₽
    icon
    DR Congo
    Gold deposit in DR Congo Gold deposit in DR Congo
    Price
    14,000,000 $
    1,141,669,200 ₽
    Currency rates calculator
    Contact REAB
    Contact REAB
    Messengers for this number