Anthropogenic Gold Deposit in Kyrgyzstan

Add to Favorites list
Add to Compare list
id - 598
icon
Kyrgyzstan
Mining industry
icon
105
  • Anthropogenic Gold Deposit in Kyrgyzstan
  • Anthropogenic Gold Deposit in Kyrgyzstan
    Anthropogenic Gold Deposit in Kyrgyzstan
  • Revenue (year) No data
    Profit (year) No data
    Payback (mon.)
    Description

    An investor is sought for a gold extraction project at an anthropogenic deposit located in the tailings facility of a state-owned gold processing plant in Kyrgyzstan. Advantages of this extraction method include minimal costs, existing infrastructure, and a rapid startup.

    Reserves

    • Total material volume: 10 million tonnes
    • Confirmed gold content: 5 tonnes
    • Grade: 0.5 g/t; recovery rate: 70%

    Work Completed

    1. Exploration and surveys conducted.
    2. Extraction project approved.
    3. Power supply available from the operating plant.
    4. Road access and utilities in place.

    Partnership Terms

    1. 31% — State
    2. 18% — License holder (provides administrative support for the tender and production organization)
    3. 51% — Investor

    Required Funds

    • Tender application: $57,000 security deposit (refundable)
    • Contribution: $200,000 (non-refundable)

    Operations can commence following the tender.

    Details provided upon signing an NDA; negotiations to follow confirmation of funds.

    The information in the catalog is not an exact offer. The parameters of the deal are specified during negotiations with the seller. The legal status of listings in this catalog is set out in the website's Information Policy, a link to which can be found at the bottom of this page.

    To perform this action, you must log in or register on the site.
    Start negotiation
    Similar adverts
    icon
    Saudi Arabia
    Gold, silicon and iron ore mining project in Saudi Arabia Gold, silicon and iron ore mining project in Saudi Arabia
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    16,000,000 $
    778,098,016 ₺
    icon
    Uganda
    Gold mine in Uganda Gold mine in Uganda
    REAB-premium
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    22,000,000 $
    1,065,911,342 ₺
    icon
    Russia
    Stake in a gold mining company in Bashkortostan, Russia Stake in a gold mining company in Bashkortostan, Russia
    Fast deal
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    750,000,000 ₽
    431,274,907 ₺
    Currency rates calculator
    Contact REAB
    Contact REAB
    Messengers for this number