Anthropogenic Gold Deposit in Kyrgyzstan

id - 598
icon
Kyrgyzstan
Mining industry
icon
2
  • Anthropogenic Gold Deposit in Kyrgyzstan
  • Anthropogenic Gold Deposit in Kyrgyzstan
    Anthropogenic Gold Deposit in Kyrgyzstan
  • ()
    ()
    ()

    An investor is sought for a gold extraction project at an anthropogenic deposit located in the tailings facility of a state-owned gold processing plant in Kyrgyzstan. Advantages of this extraction method include minimal costs, existing infrastructure, and a rapid startup.

    Reserves

    • Total material volume: 10 million tonnes
    • Confirmed gold content: 5 tonnes
    • Grade: 0.5 g/t; recovery rate: 70%

    Work Completed

    1. Exploration and surveys conducted.
    2. Extraction project approved.
    3. Power supply available from the operating plant.
    4. Road access and utilities in place.

    Partnership Terms

    1. 31% — State
    2. 18% — License holder (provides administrative support for the tender and production organization)
    3. 51% — Investor

    Required Funds

    • Tender application: $57,000 security deposit (refundable)
    • Contribution: $200,000 (non-refundable)

    Operations can commence following the tender.

    Details provided upon signing an NDA; negotiations to follow confirmation of funds.

    icon
    Kyrgyzstan
    Gold deposit in Kyrgyzstan Gold deposit in Kyrgyzstan
    ()
    ()
    ()
    17,000,000 $
    113,898,107 ¥
    icon
    Kyrgyzstan
    Gold deposit in Kyrgyzstan Gold deposit in Kyrgyzstan
    ()
    ()
    ()
    20,000,000 $
    133,997,772 ¥
    icon
    Venezuela
    Concession areas for gold mining in Venezuela Concession areas for gold mining in Venezuela
    REAB-premium Low price
    ()
    ()
    ()
    400,000 $
    2,679,956 ¥
    Contact REAB