Copper mining business with a SX-EW plant in Kazakhstan

id - 283
icon
Kazakhstan
Mining industry
icon
24
  • Copper mining business with a SX-EW plant in Kazakhstan
  • Copper mining business with a SX-EW plant in Kazakhstan
    Copper mining business with a SX-EW plant in Kazakhstan
  • ()
    ()
    ()

    Copper Mining Business with a SX-EW plant (JORC certified) in Kazakhstan is for sale.

    This deposit has been key feeder for the giant Balkhash smelter, responsible for 65% of Kazakhstan’s copper production. Dumps of over 300 mln ton accumulated from 40 years of operation.

    Resource analysis

    • Wardell Armstrong (MRI, PCR) 2020

    During 2015-2016 the company undertook exploration:

    • Reverse circulation (RC) drilling – 47 holes
    • Surface pitting – 141
    • Toe pitting – 26
    • More than 900 ore samples

    SX-EW plant results

    • The pilot plant commissioned in autumn 2017 and produced first copper in November 2017.
    • Following remedial work on the leaching pad and collection system in spring of 2018, the plant has reached a steady-state production with PLS ERE grcae of 1.5-1.6 g/L, and average daily production of 200 kg of copper cathode
    • Over 36 tons of cathode copper sold on the local market at near LME prices.
    • 1.2 km electric line fo the site and 630 kW transformer — completed and connected fo local electric grid
    • 400 m access road to the site — completed
    • 1.1 km water pipeline fo the site — completed
    • Building for the SX-EW pilot plant — completed, insulation and ventilation installed
    • 1 km of piping for the heap irrigation — purchased, connected and laid out
    • Ponds and collection trenches — completed and lined with geomembrane

    SX-EW Business Model

    • Planned annual production: 10,000 tons of LME grade “A” cathode copper
    • A 23-year copper production contract with the government of Kazakhstan signed in May 2017.

    Key production cost drivers:

    • Chemicals & Reagents and Power (variable) — favorable geographic location helps keeping these costs low
    • Labor and Production Overheads (fixed)
    • Mineral Extraction Tax @ 5.7% on value of copper in PLS
    • Distribution & Selling — mix of fixed and variable driven by local Infrastructure and T&C of the oft-take contract

    100,000,000 $
    713,918,985 ¥
    icon

    Looking for ideas on which businesses to invest in and in which markets it is profitable to buy a ready-made business? The REAB website has useful articles in the topic of "Market and Investment Niche Reviews".

    icon
    Kyrgyzstan
    Gold, silver and copper deposit in Kyrgyzstan Gold, silver and copper deposit in Kyrgyzstan
    Audit done Fast deal
    ()
    102,000,000 $
    728,197,365 ¥
    ()
    87,000,000 $
    621,109,517 ¥
    ()
    33,000,000 $
    235,593,265 ¥
    icon
    Russia
    Open-pit coal mine in Krasnoyarsk region, Russia Open-pit coal mine in Krasnoyarsk region, Russia
    ()
    ()
    ()
    825,000,000 ₽
    72,728,876 ¥
    icon
    Russia
    Coal company in the Kemerovo region, Russia Coal company in the Kemerovo region, Russia
    ()
    ()
    ()
    4,400,000,000 ₽
    387,887,337 ¥
    icon
    Uganda
    Gold mining company in Uganda Gold mining company in Uganda
    REAB-premium
    200,000,000 $
    1,427,837,969 ¥
    icon
    Turkiye
    Geothermal Power Station Project in Turkiye Geothermal Power Station Project in Turkiye
    150,000,000 $
    1,070,878,477 ¥
    icon
    Russia
    Deposit of polymetallic ores in the Magadan region, Russia Deposit of polymetallic ores in the Magadan region, Russia
    2,500,000,000 ₽
    220,390,533 ¥