    This opportunity presents a shovel-ready, utility-scale photovoltaic (PV) park project located in the highly strategic Western region of Romania, a dominant market for renewable energy in Central and Eastern Europe (CEE).

    Key Development & Permitting Milestones

    The project significantly de-risked and is positioned for immediate construction:

    • Land Security: 100% of the necessary land (442 hectares) has been secured through lease and concession contracts for a long-term duration of 30 – 49 years.
    • Permits Obtained: Both the Urbanism Certificates and the critical Grid Connection Permit (ATR) have been secured from Transelectrica (the National Transmission System Operator).
    • High-Voltage Grid Access: The connection point is confirmed and established on the high-capacity 400 kV Arad–Mintia transmission line.

    Technical Specifications & Future Upside

    • Configuration: The park will utilize a total of 732,137 high-efficiency panels (rated at 585 W each) and 1,980 inverters.
    • Specific Yield: The location benefits from high solar irradiation, resulting in an expected specific yield of 1,600 MWh/year
    • Optional Hybrid Phase: The project design is future-proofed with the option to integrate a Battery Energy Storage System (BESS) of up to 100 MWh, adding significant operational flexibility and potential revenue streams.

    Financial Projections (Estimated)

    The project offers highly attractive financial returns indicative of a premium, large-scale asset in the EU market:

    • Total Annual Energy Production: 640,000 MWh/year (640 GWh)
    • Estimated Annual Revenue: 51–57 million EUR/year
    • Estimated CAPEX: 200 million EUR
    • Estimated Payback Period: 4–5 years

    This opportunity offers international investors a direct pathway to acquire a large-scale, de-risked, and bankable asset contributing to one of the fastest-growing renewable energy markets in Europe.

    28,000,000 €
    231,410,108 ¥
    icon

    Want to receive regular updates from this website — new lots, articles, news? Subscribe to them in your preferred social network. The list of all social networks with our publications is at the bottom of any page of the website.

    icon
    Romania
    Solar photovoltaic power plant (108 MW) in Romania Solar photovoltaic power plant (108 MW) in Romania
    ()
    ()
    ()
    8,640,000 €
    71,340,406 ¥
    icon
    Turkiye
    Photovoltaic solar power plants (48,2 MWp) in Turkiye Photovoltaic solar power plants (48,2 MWp) in Turkiye
    ()
    10,000,000 $
    70,522,353 ¥
    ()
    ()
    55,500,000 $
    391,399,055 ¥
    icon
    Bosnia and Herzegovina
    Photovoltaic power plant in Bosnia and Herzegovina Photovoltaic power plant in Bosnia and Herzegovina
    ()
    ()
    ()
    20,674,000 €
    170,705,040 ¥