Open-pit coal mine on Sakhalin, Russia

id - 617
icon
Russia
Mining industry
icon
51
  • Open-pit coal mine on Sakhalin, Russia
  • Open-pit coal mine on Sakhalin, Russia
    Open-pit coal mine on Sakhalin, Russia
  • Urgent! Fast deal
    ()
    ()
    ()

    An operating open-pit coal mine in the Sakhalin Region, Russian Federation, is available for acquisition.

    Deposit characteristics

    • The deposit's coal-bearing potential is associated with the deposits of the Verkhneduy Formation. Seven workable coal seams have been identified in the upper section, and thirteen in the middle section, with average thicknesses ranging from 0.8 m to 2.8 m.
    • Coal grades include DG, GZhO, G6, G14, and GZh; the minimum calorific value ranges from 5,500 to 6,700 kcal/kg.
    • Coal reserves were approved by protocols from the USSR State Commission on Mineral Reserves (GKZ) in 1989 and the Sakhalinnedra Territorial Commission on Mineral Reserves (TKZ) in 2010.
    • Approved coal reserves for open-pit mining total 600,000 tonnes across various categories.
    • Coal reserves totaling 65,000,000 tonnes are present at the 400-meter horizon.
    • Remaining coal reserves on the subsoil user's balance sheet for open-pit mining areas were: OGR-1 – 244,000 tonnes; OGR-2 – 372,000 tonnes.
    • Remaining reserves in underground mining areas: Category C1 – approximately 45,000,000 tonnes; at the 250-meter horizon and below – 20,000,000 tonnes.
    • Balance-sheet methane reserves (Category C2): 141,987,000 m³.
    • Estimated prognostic methane resources: P1 – 1,222,525,000 m³; P2 – 217,478,000 m³.

    Asset Status, Infrastructure, and Logistics

    • The license is valid until 2029.
    • Mining operations at the site are currently suspended.
    • There are two coal stockpiles on-site for temporary storage: an upper yard (capacity: 30,000–40,000 tonnes) and a lower yard (capacity: 20,000–30,000 tonnes). There is potential to expand the storage area.
    • Transport access to the site is provided via existing all-season industrial roads: one connects the site to the operations base, while the other links to the highway used for transporting coal to seaports.

    Transaction Terms

    • Additional information and documents will be provided strictly after the signing of an NDA by the end buyer or their direct representative.
    • Negotiations will commence strictly after proof of funds is provided.
    • Payment in USDT is possible.
    • Current terms are valid until January 2027, after which they are subject to change.

    17,000,000 $
    114,151,784 ¥
    icon

    Interested in an ad in the catalog? To avoid losing it and easily find it in the future, add it to "Favorites". To do this, click the heart icon in the upper right corner of the card or ad page.

    icon
    Venezuela
    Concession areas for gold mining in Venezuela Concession areas for gold mining in Venezuela
    REAB-premium Low price
    ()
    ()
    ()
    400,000 $
    2,685,754 ¥
    icon
    Uganda
    Gold mining company in Uganda Gold mining company in Uganda
    REAB-premium
    ()
    ()
    50,000,000 $
    335,719,143 ¥
    ()
    200,000,000 $
    1,342,876,569 ¥
    icon
    Tanzania
    Gold deposit and mining company in Tanzania Gold deposit and mining company in Tanzania
    REAB-premium
    ()
    ()
    ()
    22,000,000 $
    147,716,423 ¥
    Contact REAB