Operational Wind Power Plant (5 MW) in Kazakhstan

Add to Favorites list
Add to Compare list
id - 342
icon
Kazakhstan
Electric power industry
icon
2150
  • Operational Wind Power Plant (5 MW) in Kazakhstan
  • Operational Wind Power Plant (5 MW) in Kazakhstan
    Operational Wind Power Plant (5 MW) in Kazakhstan
  • Revenue (year) 537,000 €
    29,982,519 ₺
    Profit (year) 318,000 €
    17,755,011 ₺
    Payback (mon.)
    Description

    An operational wind energy generation business located in the Republic of Kazakhstan, offering investors a rare opportunity to acquire a fully functioning renewable energy asset with stable returns, government-backed tariffs, and proven production performance.

    Core Highlights

    • Active government-backed PPA until 2034.
    • Established wind farm in western Kazakhstan, operating since 2019.
    • 5 MW of installed capacity using European-manufactured turbines.
    • Strategically positioned near the Caspian Sea, in a high-wind corridor close to Aktau.
    • Fully staffed with a locally trained operations team and robust technical oversight.
    • Operating under a legally established Kazakhstani entity with a history dating to 2015.

    Financial Performance

    • Consistent cash flow from long-term electricity sales under the state’s renewable energy scheme.
    • Regular maintenance and spare parts stock ensure uninterrupted operations.
    • No Debt.

    Asset Details

    • 1 x Enercon E-70 E4 (2.0 MW) – Germany.
    • 2 x Micon NM-1500C/64 (1.5 MW each) – Denmark.
    • Located in open terrain near the sea, benefiting from favorable and consistent wind flows.
    • Site selected based on long-term meteorological data and wind rose studies.
    • Fully compliant with Kazakhstan’s industrial and environmental safety standards.

    Revenue Model

    • Electricity sold to the Settlement and Financial Center (RFC) at a state-guaranteed green tariff.
    • 15-year Power Purchase Agreement (PPA) in place from 2019 to 2034, with annual indexation.
    • 2024 fixed tariff: 34.74 KZT/kWh (~€0.067)
    • Backed by Kazakhstan’s Renewable Energy Law.

    Valuation Estimates

    • EV/EBITDA-based valuation: ~€3.8 million.
    • Installed capacity-based valuation: ~€5.9 million.
    • Sale includes full company ownership, permits, land rights, equipment, infrastructure, and personnel.

    The information in the catalog is not an exact offer. The parameters of the deal are specified during negotiations with the seller. The legal status of listings in this catalog is set out in the website's Information Policy, a link to which can be found at the bottom of this page.

    To perform this action, you must log in or register on the site.
    Start negotiation
    Similar adverts
    icon
    Kazakhstan
    Cascade of two hydroelectric power plants (6+6 MW) in the Almaty region, Kazakhstan Cascade of two hydroelectric power plants (6+6 MW) in the Almaty region, Kazakhstan
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    7,500,000 $
    363,378,867 ₺
    icon
    Kazakhstan
    40 MW Off-Grid Power Site & Data Center Development in Kazakhstan 40 MW Off-Grid Power Site & Data Center Development in Kazakhstan
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    158,000,000 $
    7,655,181,452 ₺
    icon
    Kyrgyzstan
    Hydro power plant (5,4MW) in Kyrgyzstan Hydro power plant (5,4MW) in Kyrgyzstan
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    80
    Price
    8,990,000 $
    437,193,823 ₺
    Currency rates calculator
    Contact REAB
    Contact REAB
    Messengers for this number