Cascade of two hydroelectric power plants (6+6 MW) in the Almaty region, Kazakhstan

Add to Favorites list
Add to Compare list
id - 425
icon
Kazakhstan
Electric power industry
icon
89
  • Cascade of two hydroelectric power plants (6+6 MW) in the Almaty region, Kazakhstan
  • Cascade of two hydroelectric power plants (6+6 MW) in the Almaty region, Kazakhstan
    Cascade of two hydroelectric power plants (6+6 MW) in the Almaty region, Kazakhstan
  • Revenue (year) No data
    Profit (year) No data
    Payback (mon.)
    Description

    The Hydropower Plant Cascade project represents a key development in the renewable energy infrastructure of the Almaty Region.

    This initiative is structured as a cascade system, featuring two hydroelectric power plants: HPP-1 and HPP-2. Together, they offer a substantial total installed capacity of 12 MW, with each plant contributing 6 MW of clean energy.

    The location in the Almaty Region is ideal, chosen specifically for its strong hydrological potential—an abundant and reliable water resource necessary for consistent hydropower generation. Furthermore, the region is recognized for its well-established renewable energy sector, allowing the project to seamlessly integrate with existing infrastructure and support the area’s transition to sustainable power. This project is set to be a reliable, long-term source of green electricity.

    Kazakhstan has significant hydropower resources, with an estimated 170 billion kWh of gross potential and 62 billion kWh of feasible potential. This River is located within the country’s South-Eastern hydropower zone, a priority area for small HP expansion to support Kazakhstan’s long-term renewable energy targets.

    The project has been designed based on detailed topographic and hydrological assessments, and the environmental safety of the facility.

    Each HPP of the cascade is a combination of hydraulic structures and electromechanical equipment that convert the gravitational energy of the water flow into electrical energy for delivery to the regional grid. The expected lifespan of the plant is 25-35 years, with potential for significantly longer service life given standard refurbishment cycles typical in hydropower assets.

    Main technical and economic parameters of the designed HPP-1 & HPP2

    Name (indicator) Units of measurement Value of the indicator (HPP1) Value of the indicator (HPP2)
    Recommended (indicative) installed power MW 2х3’000 2х3’000
    Head (gross) m 167,271 167,271
    Working pressure (net), m m 157,33—166,79 157,33—166,79
    Maximum water flow through the turbine m3/s 4,7 4,7
    Indicative volume of electricity generation million kWh 28,964 24,448

    Indicative unified main technical and economic parameters of the designed HPP Cascade (HPP-1 and HPP-2)

    Parameter name Units of measurement Value of the indicator
    Installed capacity kW 12 000,00
    Electricity production (annual) million kWh 53,412
    Construction cost (excluding IDC) thousand USD 19 998,93
    Construction Cost (including IDC and loan charHPP) thousand USD 23 139,03
    Specific capital investment per 1 kW USD per 1 kW 1 666,58
    Specific capital investment per 1 kWh USD per 1 kW 0,37
    Electricity tariff during the payback period (“fixed tariff”)* KZT per 1 kW*h 37,05
    Net income in the first year of operation during the payback period thousand USD 3 498,43
    Net income in the first year after the payback period thousand USD 5 995,70
    Net Present Value (NPV) thousand USD 10 977,61
    Internal Financial Rate of Return % 27,3
    Payback period (discounted) years 9
    Payback period (downtime) years 5,72
    Profitability Index   1,38

    The information in the catalog is not an exact offer. The parameters of the deal are specified during negotiations with the seller.

    To perform this action, you must log in or register on the site.
    Start negotiation
    Price
    7,500,000 $
    570,702,750 ₽
    To perform this action, you must log in or register on the site.
    Start negotiation
    icon REAB Services

    Company Registration — General Provisions

    The procedure and scope of provision of services for business registration and support.

    Company registration in Russia

    Russia's attractiveness for business is due to its unique combination of economic advantages, modern infrastructure, and a favorable legal framework.

    Company registration in Kazakhstan

    Kazakhstan offers foreign investors a simple and transparent registration process, the opportunity for full company ownership, and access to business incentives in certain sectors and free economic zones.

    Company registration in Uzbekistan

    Uzbekistan, one of the most densely populated countries in Central Asia, is quickly becoming one of the most favorable destinations for starting a business in the region.

    Company registration in Kyrgyzstan

    Kyrgyzstan is one of the most open countries in the CIS for foreign business and investment. Low taxes, an accessible workforce, and its geographic location make Kyrgyzstan a convenient location for starting a company.

    Company registration in Serbia

    Serbia offers foreigners a simple and transparent company registration process, low taxes, and a favorable business environment.

    Company registration in Bosnia and Herzegovina

    Bosnia and Herzegovina offers foreign investors a simple registration process, low taxes, and the opportunity to exercise complete control over their business.

    Company registration in Montenegro

    Montenegro attracts foreigners with its stable economy, low taxes, the ability to conduct business in euros, and access to the European market.

    Company registration in Romania

    Romania is attractive to foreigners due to its EU membership, low taxes, and favorable investment conditions. Registering a company in Romania also allows you to obtain a residence permit.

    Company registration in Turkiye

    Turkiye offers foreign investors the opportunity to have full control over their business, relatively low authorized capital and a transparent registration procedure.

    Company registration in Qatar

    Qatar offers a favorable environment for foreign businesses, particularly within its free zones, while maintaining certain registration and licensing requirements.

    Company registration in the UAE

    Foreigners registering a company in the United Arab Emirates has a number of specific features depending on the location and type of business. Foreign entrepreneurs have access to extensive opportunities for full business ownership, flexible registration terms, and a preferential tax regime.

    Company registration in Oman

    Oman offers foreign investors flexible business conditions, allowing them to establish companies both in mainland Oman and in special economic zones. In recent years, the country has significantly simplified registration procedures and strengthened investor protection.

    Company registration in Venezuela

    Venezuela remains a country with great economic potential and attracts interest from foreign investors, but doing business here requires understanding the local legal system and the specific conditions for foreign capital. Therefore, when establishing a company, it's important for foreigners to consider several key aspects.
    icon Useful tip

    You can view prices for objects in the catalog and its basic business indicators in two currencies. The first one is the original currency set by the seller. The second one you can choose yourself. It's calculated by the rate of the Central Bank of the Russian Federation.

    Similar adverts
    icon
    Kazakhstan
    Project of 4 Hydro power plants (33 MW) in Kazakhstan Project of 4 Hydro power plants (33 MW) in Kazakhstan
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    12,500,000 $
    965,916,251 ₽
    icon
    Kazakhstan
    Wind farm power station (5 MW) in Kazakhstan Wind farm power station (5 MW) in Kazakhstan
    Revenue (year)
    585,000 $
    45,204,881 ₽
    Profit (year)
    346,000 $
    26,736,562 ₽
    Payback (mon.)
    Price
    4,000,000 $
    309,093,200 ₽
    icon
    Turkiye
    Photovoltaic solar power plants (48,2 MWp) in Turkiye Photovoltaic solar power plants (48,2 MWp) in Turkiye
    Revenue (year)
    10,000,000 $
    772,733,001 ₽
    Profit (year)
    No data
    Payback (mon.)
    Price
    55,500,000 $
    4,288,668,151 ₽
    Currency rates calculator
    Contact REAB
    Contact REAB
    Messengers for this number