Copper mining business with a SX-EW plant in Kazakhstan

Add to Favorites list
Add to Compare list
id - 283
icon
Kazakhstan
Mining industry
icon
543
  • Copper mining business with a SX-EW plant in Kazakhstan
  • Copper mining business with a SX-EW plant in Kazakhstan
    Copper mining business with a SX-EW plant in Kazakhstan
  • Revenue (year) No data
    Profit (year) No data
    Payback (mon.)
    Description

    Copper Mining Business with a SX-EW plant (JORC certified) in Kazakhstan is for sale.

    This deposit has been key feeder for the giant Balkhash smelter, responsible for 65% of Kazakhstan’s copper production. Dumps of over 300 mln ton accumulated from 40 years of operation.

    Resource analysis

    • Wardell Armstrong (MRI, PCR) 2020

    During 2015-2016 the company undertook exploration:

    • Reverse circulation (RC) drilling – 47 holes
    • Surface pitting – 141
    • Toe pitting – 26
    • More than 900 ore samples

    SX-EW plant results

    • The pilot plant commissioned in autumn 2017 and produced first copper in November 2017.
    • Following remedial work on the leaching pad and collection system in spring of 2018, the plant has reached a steady-state production with PLS ERE grcae of 1.5-1.6 g/L, and average daily production of 200 kg of copper cathode
    • Over 36 tons of cathode copper sold on the local market at near LME prices.
    • 1.2 km electric line fo the site and 630 kW transformer — completed and connected fo local electric grid
    • 400 m access road to the site — completed
    • 1.1 km water pipeline fo the site — completed
    • Building for the SX-EW pilot plant — completed, insulation and ventilation installed
    • 1 km of piping for the heap irrigation — purchased, connected and laid out
    • Ponds and collection trenches — completed and lined with geomembrane

    SX-EW Business Model

    • Planned annual production: 10,000 tons of LME grade “A” cathode copper
    • A 23-year copper production contract with the government of Kazakhstan signed in May 2017.

    Key production cost drivers:

    • Chemicals & Reagents and Power (variable) — favorable geographic location helps keeping these costs low
    • Labor and Production Overheads (fixed)
    • Mineral Extraction Tax @ 5.7% on value of copper in PLS
    • Distribution & Selling — mix of fixed and variable driven by local Infrastructure and T&C of the oft-take contract

    The information in the catalog is not an exact offer. The parameters of the deal are specified during negotiations with the seller.

    To perform this action, you must log in or register on the site.
    Start negotiation
    Price
    100,000,000 $
    7,995,890,000 ₽
    To perform this action, you must log in or register on the site.
    Start negotiation
    icon Useful tip

    You can view prices for objects in the catalog and its basic business indicators in two currencies. The first one is the original currency set by the seller. The second one you can choose yourself. It's calculated by the rate of the Central Bank of the Russian Federation.

    Similar adverts
    icon
    Kazakhstan
    Deposit of bauxite and aluminum in Kazakhstan Deposit of bauxite and aluminum in Kazakhstan
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    No data
    icon
    Russia
    Deposit of polymetallic ores in the Magadan region, Russia Deposit of polymetallic ores in the Magadan region, Russia
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    2,500,000,000 ₽
    icon
    Kazakhstan
    Crushed stone quarry, Kazakhstan Crushed stone quarry, Kazakhstan
    Urgent! Fast deal
    Revenue (year)
    2,100,000 $
    167,913,690 ₽
    Profit (year)
    500,000 $
    39,979,450 ₽
    Payback (mon.)
    36
    Price
    4,300,000 $
    343,823,270 ₽
    Currency rates calculator
    Contact REAB
    Contact REAB
    Messengers for this number