Opportunity to acquire a 300 MW pipeline consisting of one RTB (Ready-to-Build) asset with an active PPA and two advanced-stage projects targeting high-value mining and urban demand.
| Feature | Project 1: Vaca Muerta (Neuquén) | Project 2 & 3: Catamarca |
| Capacity | 100 MW (Scalable from 30 MW phase) | 200 MW Total (2 x 100 MW) |
| Status | RTB / Partially Operating (3 MW active) | Advanced Stage / Government Evaluation |
| Offtaker | Pampa Energía & Local Municipality | Mining Industry & Urban Demand |
| PPA Price | USD 68/MW (Potential to renegotiate) | USD 92/MW (Estimated) |
| Timeline | 18 months to full completion | Provincial approval expected near-term |
| Strategic Edge | Immediate entry; existing PPA reduces risk | High-margin mining demand; strong backing. |
The current renewable energy market is characterized by a scarcity of sellers. Most major players are holding assets for long-term cash flow.
The information in the catalog is not an exact offer. The parameters of the deal are specified during negotiations with the seller.