Solar Photovoltaic Plant Project (300 MW) in Argentina

Add to Favorites list
Add to Compare list
id - 511
icon
Argentina
Electric power industry
icon
902
  • Solar Photovoltaic Plant Project (300 MW) in Argentina
  • Solar Photovoltaic Plant Project (300 MW) in Argentina
    Solar Photovoltaic Plant Project (300 MW) in Argentina
  • Revenue (year) No data
    Profit (year) No data
    Payback (mon.)
    Description

    Opportunity to acquire a 300 MW pipeline consisting of one RTB (Ready-to-Build) asset with an active PPA and two advanced-stage projects targeting high-value mining and urban demand.

    Overview

    • Core Competencies: Full-cycle EPC, construction supervision, O&M, and permitting.
    • Institutional Strength: Deep-rooted relationships with legislative authorities and provincial governments in Catamarca, Salta, and Neuquén.
    • Value Add: Capability to navigate complex regulatory environments and secure PPAs in high-demand sectors (Mining/Industrial).
    Feature Project 1: Vaca Muerta (Neuquén) Project 2 & 3: Catamarca
    Capacity 100 MW (Scalable from 30 MW phase) 200 MW Total (2 x 100 MW)
    Status RTB / Partially Operating (3 MW active) Advanced Stage / Government Evaluation
    Offtaker Pampa Energía & Local Municipality Mining Industry & Urban Demand
    PPA Price USD 68/MW (Potential to renegotiate) USD 92/MW (Estimated)
    Timeline 18 months to full completion Provincial approval expected near-term
    Strategic Edge Immediate entry; existing PPA reduces risk High-margin mining demand; strong backing.

    The current renewable energy market is characterized by a scarcity of sellers. Most major players are holding assets for long-term cash flow.

    • The Opportunity: To avoid the “buyer’s premium” on fully operational assets, Interenergy should pivot toward RTB and under-construction projects. This allows for capturing early-stage value and securing positioning in high-growth corridors like the Vaca Muerta energy hub and the Northern mining belt.
    • Comparative Analysis: These assets should be benchmarked against the Jinko Cordillera — Cordillera 1 Project to determine the optimal financial and technical fit.

    The information in the catalog is not an exact offer. The parameters of the deal are specified during negotiations with the seller. The legal status of listings in this catalog is set out in the website's Information Policy, a link to which can be found at the bottom of this page.

    To perform this action, you must log in or register on the site.
    Start negotiation
    Price
    19,500,000 $
    1,643,009,550 ₽
    To perform this action, you must log in or register on the site.
    Start negotiation
    icon Useful tip

    Want to convert the amount into another currency at the rate? On the catalog pages, at the bottom right, there is a button with currency icons, it opens a calculator. Our website has more than 20 currencies with daily recalculation of the rate.

    Similar adverts
    icon
    Kazakhstan
    40 MW Off-Grid Power Site & Data Center Development in Kazakhstan 40 MW Off-Grid Power Site & Data Center Development in Kazakhstan
    Revenue (year)
    No data
    Profit (year)
    No data
    Payback (mon.)
    Price
    158,000,000 $
    13,312,590,200 ₽
    icon
    Brazil
    Wind farm (32.5 MW) in northeastern Brazil Wind farm (32.5 MW) in northeastern Brazil
    Revenue (year)
    8,606,051 $
    725,119,179 ₽
    Profit (year)
    No data
    Payback (mon.)
    Price
    5,000,000 $
    421,284,500 ₽
    icon
    Kazakhstan
    Wind farm power station (5 MW) in Kazakhstan Wind farm power station (5 MW) in Kazakhstan
    Revenue (year)
    585,000 $
    49,255,538 ₽
    Profit (year)
    346,000 $
    29,132,335 ₽
    Payback (mon.)
    Price
    4,000,000 $
    336,790,000 ₽
    Currency rates calculator
    Contact REAB
    Contact REAB
    Messengers for this number