Opportunity to acquire a 300 MW pipeline consisting of one RTB (Ready-to-Build) asset with an active PPA and two advanced-stage projects targeting high-value mining and urban demand.
| Feature | Project 1: Vaca Muerta (Neuquén) | Project 2 & 3: Catamarca |
| Capacity | 100 MW (Scalable from 30 MW phase) | 200 MW Total (2 x 100 MW) |
| Status | RTB / Partially Operating (3 MW active) | Advanced Stage / Government Evaluation |
| Offtaker | Pampa Energía & Local Municipality | Mining Industry & Urban Demand |
| PPA Price | USD 68/MW (Potential to renegotiate) | USD 92/MW (Estimated) |
| Timeline | 18 months to full completion | Provincial approval expected near-term |
| Strategic Edge | Immediate entry; existing PPA reduces risk | High-margin mining demand; strong backing. |
The current renewable energy market is characterized by a scarcity of sellers. Most major players are holding assets for long-term cash flow.
The information in the catalog is not an exact offer. The parameters of the deal are specified during negotiations with the seller. The legal status of listings in this catalog is set out in the website's Information Policy, a link to which can be found at the bottom of this page.