Cascade of two hydroelectric power plants (6+6 MW) in the Almaty region, Kazakhstan

id - 425
icon
Kazakhstan
Electric power industry
icon
42
  • Cascade of two hydroelectric power plants (6+6 MW) in the Almaty region, Kazakhstan
  • Cascade of two hydroelectric power plants (6+6 MW) in the Almaty region, Kazakhstan
    Cascade of two hydroelectric power plants (6+6 MW) in the Almaty region, Kazakhstan
  • ()
    ()
    ()

    The Hydropower Plant Cascade project represents a key development in the renewable energy infrastructure of the Almaty Region.

    This initiative is structured as a cascade system, featuring two hydroelectric power plants: HPP-1 and HPP-2. Together, they offer a substantial total installed capacity of 12 MW, with each plant contributing 6 MW of clean energy.

    The location in the Almaty Region is ideal, chosen specifically for its strong hydrological potential—an abundant and reliable water resource necessary for consistent hydropower generation. Furthermore, the region is recognized for its well-established renewable energy sector, allowing the project to seamlessly integrate with existing infrastructure and support the area’s transition to sustainable power. This project is set to be a reliable, long-term source of green electricity.

    Kazakhstan has significant hydropower resources, with an estimated 170 billion kWh of gross potential and 62 billion kWh of feasible potential. This River is located within the country’s South-Eastern hydropower zone, a priority area for small HP expansion to support Kazakhstan’s long-term renewable energy targets.

    The project has been designed based on detailed topographic and hydrological assessments, and the environmental safety of the facility.

    Each HPP of the cascade is a combination of hydraulic structures and electromechanical equipment that convert the gravitational energy of the water flow into electrical energy for delivery to the regional grid. The expected lifespan of the plant is 25-35 years, with potential for significantly longer service life given standard refurbishment cycles typical in hydropower assets.

    Main technical and economic parameters of the designed HPP-1 & HPP2

    Name (indicator) Units of measurement Value of the indicator (HPP1) Value of the indicator (HPP2)
    Recommended (indicative) installed power MW 2х3’000 2х3’000
    Head (gross) m 167,271 167,271
    Working pressure (net), m m 157,33—166,79 157,33—166,79
    Maximum water flow through the turbine m3/s 4,7 4,7
    Indicative volume of electricity generation million kWh 28,964 24,448

    Indicative unified main technical and economic parameters of the designed HPP Cascade (HPP-1 and HPP-2)

    Parameter name Units of measurement Value of the indicator
    Installed capacity kW 12 000,00
    Electricity production (annual) million kWh 53,412
    Construction cost (excluding IDC) thousand USD 19 998,93
    Construction Cost (including IDC and loan charHPP) thousand USD 23 139,03
    Specific capital investment per 1 kW USD per 1 kW 1 666,58
    Specific capital investment per 1 kWh USD per 1 kW 0,37
    Electricity tariff during the payback period (“fixed tariff”)* KZT per 1 kW*h 37,05
    Net income in the first year of operation during the payback period thousand USD 3 498,43
    Net income in the first year after the payback period thousand USD 5 995,70
    Net Present Value (NPV) thousand USD 10 977,61
    Internal Financial Rate of Return % 27,3
    Payback period (discounted) years 9
    Payback period (downtime) years 5,72
    Profitability Index   1,38

    7,500,000 $
    53,173,706 ¥
    icon

    Each country has its own laws and rules for investors and business buyers. How to get around all the obstacles? Read related articles “Investor Life Hacks”.

    icon
    Brazil
    Hydroelectric power station in Brazil Hydroelectric power station in Brazil
    ()
    ()
    ()
    5,000,000 $
    35,050,318 ¥
    icon
    Bosnia and Herzegovina
    Photovoltaic power plant in Bosnia and Herzegovina Photovoltaic power plant in Bosnia and Herzegovina
    ()
    ()
    ()
    20,674,000 €
    170,616,821 ¥
    icon
    Kyrgyzstan
    Hydro power plant (5,4MW) in Kyrgyzstan Hydro power plant (5,4MW) in Kyrgyzstan
    ()
    ()
    ()
    80
    8,990,000 $
    63,020,471 ¥