Copper mining business with a SX-EW plant in Kazakhstan

id - 283
icon
Kazakhstan
Mining industry
icon
33
  • Copper mining business with a SX-EW plant in Kazakhstan
  • Copper mining business with a SX-EW plant in Kazakhstan
    Copper mining business with a SX-EW plant in Kazakhstan
  • ()
    ()
    ()

    Copper Mining Business with a SX-EW plant (JORC certified) in Kazakhstan is for sale.

    This deposit has been key feeder for the giant Balkhash smelter, responsible for 65% of Kazakhstan’s copper production. Dumps of over 300 mln ton accumulated from 40 years of operation.

    Resource analysis

    • Wardell Armstrong (MRI, PCR) 2020

    During 2015-2016 the company undertook exploration:

    • Reverse circulation (RC) drilling – 47 holes
    • Surface pitting – 141
    • Toe pitting – 26
    • More than 900 ore samples

    SX-EW plant results

    • The pilot plant commissioned in autumn 2017 and produced first copper in November 2017.
    • Following remedial work on the leaching pad and collection system in spring of 2018, the plant has reached a steady-state production with PLS ERE grcae of 1.5-1.6 g/L, and average daily production of 200 kg of copper cathode
    • Over 36 tons of cathode copper sold on the local market at near LME prices.
    • 1.2 km electric line fo the site and 630 kW transformer — completed and connected fo local electric grid
    • 400 m access road to the site — completed
    • 1.1 km water pipeline fo the site — completed
    • Building for the SX-EW pilot plant — completed, insulation and ventilation installed
    • 1 km of piping for the heap irrigation — purchased, connected and laid out
    • Ponds and collection trenches — completed and lined with geomembrane

    SX-EW Business Model

    • Planned annual production: 10,000 tons of LME grade “A” cathode copper
    • A 23-year copper production contract with the government of Kazakhstan signed in May 2017.

    Key production cost drivers:

    • Chemicals & Reagents and Power (variable) — favorable geographic location helps keeping these costs low
    • Labor and Production Overheads (fixed)
    • Mineral Extraction Tax @ 5.7% on value of copper in PLS
    • Distribution & Selling — mix of fixed and variable driven by local Infrastructure and T&C of the oft-take contract

    100,000,000 $
    713,918,985 ¥
    icon

    Interested in buying a business in a specific country or industry? Make a selection of lots by this country or industry — these conditions are in the filter in all sections of the catalog.

    icon
    Kazakhstan
    Marbled limestone deposit, Kazakhstan Marbled limestone deposit, Kazakhstan
    Fast deal
    ()
    ()
    ()
    3,700,000 $
    26,415,003 ¥
    icon
    Turkiye
    Baryte deposit in Turkiye Baryte deposit in Turkiye
    ()
    ()
    ()
    6,000,000 $
    42,835,140 ¥
    icon
    Kazakhstan
    Coal mine in Karaganda region, Kazakhstan Coal mine in Karaganda region, Kazakhstan
    ()
    ()
    ()
    3,500,000 $
    24,987,165 ¥