Copper mining business with a SX-EW plant in Kazakhstan

id - 283
icon
Kazakhstan
Mining industry
icon
897
  • Copper mining business with a SX-EW plant in Kazakhstan
  • Copper mining business with a SX-EW plant in Kazakhstan
    Copper mining business with a SX-EW plant in Kazakhstan
  • ()
    ()
    ()

    Copper Mining Business with a SX-EW plant (JORC certified) in Kazakhstan is for sale.

    This deposit has been key feeder for the giant Balkhash smelter, responsible for 65% of Kazakhstan’s copper production. Dumps of over 300 mln ton accumulated from 40 years of operation.

    Resource analysis

    • Wardell Armstrong (MRI, PCR) 2020

    During 2015-2016 the company undertook exploration:

    • Reverse circulation (RC) drilling – 47 holes
    • Surface pitting – 141
    • Toe pitting – 26
    • More than 900 ore samples

    SX-EW plant results

    • The pilot plant commissioned in autumn 2017 and produced first copper in November 2017.
    • Following remedial work on the leaching pad and collection system in spring of 2018, the plant has reached a steady-state production with PLS ERE grcae of 1.5-1.6 g/L, and average daily production of 200 kg of copper cathode
    • Over 36 tons of cathode copper sold on the local market at near LME prices.
    • 1.2 km electric line fo the site and 630 kW transformer — completed and connected fo local electric grid
    • 400 m access road to the site — completed
    • 1.1 km water pipeline fo the site — completed
    • Building for the SX-EW pilot plant — completed, insulation and ventilation installed
    • 1 km of piping for the heap irrigation — purchased, connected and laid out
    • Ponds and collection trenches — completed and lined with geomembrane

    SX-EW Business Model

    • Planned annual production: 10,000 tons of LME grade “A” cathode copper
    • A 23-year copper production contract with the government of Kazakhstan signed in May 2017.

    Key production cost drivers:

    • Chemicals & Reagents and Power (variable) — favorable geographic location helps keeping these costs low
    • Labor and Production Overheads (fixed)
    • Mineral Extraction Tax @ 5.7% on value of copper in PLS
    • Distribution & Selling — mix of fixed and variable driven by local Infrastructure and T&C of the oft-take contract

    100,000,000 $
    8,493,090,000 ₽
    icon

    Want to receive regular updates from this website — new lots, articles, news? Subscribe to them in your preferred social network. The list of all social networks with our publications is at the bottom of any page of the website.

    icon
    Russia
    Gold and polymetallic deposit in the Chelyabinsk region, Russia Gold and polymetallic deposit in the Chelyabinsk region, Russia
    ()
    ()
    ()
    4,200,000,000 ₽
    icon
    Russia
    Dolerite deposit in the Irkutsk Region, Russia Dolerite deposit in the Irkutsk Region, Russia
    ()
    ()
    ()
    350,000,000 ₽
    icon
    Russia
    Ore gold deposit complex in the Magadan Region, Russia Ore gold deposit complex in the Magadan Region, Russia
    REAB-premium
    ()
    ()
    ()
    7,600,000,000 ₽
    icon
    Russia
    Aesthetic medicine clinic, Moscow, Russia Aesthetic medicine clinic, Moscow, Russia
    REAB-premium
    1,100,000,000 ₽
    Contact REAB